Hitachi HH0-200 - Certified Modular Integration Specialist exam Exam
Page: 1 / 22
Total 109 questions
Question #1 (Topic: Topic 1)
You have assembled and installed a Hitachi Thunder 9570V?subsystemRK and a RKA into
a 19 inch rack. system parameters have also been configured. customer now needs to
use port 0A in order to connect HP-UX with a LUN 0 and Solaris with a LUN 0 on the same
port. Which two will enable this configuration? (Choose two.)
a 19 inch rack. system parameters have also been configured. customer now needs to
use port 0A in order to connect HP-UX with a LUN 0 and Solaris with a LUN 0 on the same
port. Which two will enable this configuration? (Choose two.)
A. install the LUN SECURITY license
B. create two host groups on port 0A
C. install the LUN-MANAGEMENT license
D. configure port 0A to work in HP-UX mode
Answer: B,C
Question #2 (Topic: Topic 1)
What is the operational humidity requirement at a site when installing a Hitachi Thunder
9500V?Series subsystem?
9500V?Series subsystem?
A. 5% to 90%
B. 8% to 80%
C. 10% to 75%
D. 10% to 90%
Answer: B
Question #3 (Topic: Topic 1)
Which statement is true about cache slots on the Hitachi Thunder 9500V?Series
subsystem?
subsystem?
A. Each controller has two cache slots and each slot can hold 1GB DIMMS for a maximum of 2GB per controller.
B. Each controller has two cache slots and each slot can hold 512MB or 1GB DIMMS for a maximum of 1GB or 2GB per controller.
C. Each controller has four cache slots and each slot can hold 512MB or 1GB DIMMS for a maximum of 2 GB or 4GB per controller.
D. Each controller has four cache slots and each slot can hold 256MB or 512MB DIMMS for a maximum of 1 GB or 2 GB per controller.
Answer: B
Question #4 (Topic: Topic 1)
HOTSPOT
Click the Task button. Click on the "letter" representing the LED that indicates a failure in
the controller.
Click the Task button. Click on the "letter" representing the LED that indicates a failure in
the controller.
Answer: [Hitachi-HH0-200-5.0/Hitachi-HH0-200-3_2.png]
Question #5 (Topic: Topic 1)
Which component on the first RKA is used to connect to the RK in a Hitachi Thunder
9570V?Series subsystem?
9570V?Series subsystem?
A. PDB
B. ENC unit
C. Controller unit
D. AC Power Unit
Answer: B