Dell E20-690 - VNX Solutions Specialist Exam for Platform Engineers Exam

Question #11 (Topic: )
How many private networks are used for each Control Station that is managing a fully
populated DME?
A. 2 B. 1 C. 3 D. 4
Answer: A
Question #12 (Topic: )
Refer to the exhibit.
[EMC-E20-690-7.0/EMC-E20-690-7_2.png]
You are using Unisphere to troubleshoot an alert from the VNX. What does the icon
indicate?
A. Storage system is unsupported. B. Storage system is unmanaged. C. Storage system is inaccessible. D. Storage system is degraded.
Answer: A
Question #13 (Topic: )
Which condition must be met before starting the Unisphere Storage System Initialization
Utility?
A. Computer used for the installation is on the same subnet as the storage system B. Computer used for the installation is on the same subnet as the VNX internal network C. Amber lights on the power supplies are blinking at 4 Hz D. Blue lights on the Storage Processors are blinking at 1 Hz
Answer: A
Question #14 (Topic: )
An engineer is installing a VNX Block system with two SPSs, a DPE, and two optional
DAEs. After connecting the SPSs, which ports on the DPE would the engineer use to install
the first DAE and the second DAE?
A. SAS port 1 from the DPE to the first DAE. SAS port 0 from the DPE to the second DAE. B. SAS port 0 from the DPE to the first DAE. SAS port 1 from the DPE to the second DAE. C. SAS port 1 from the DPE to the first DAE. SAS port 0 from I/O module 1 on the DPE to the second DAE. D. SAS port 0 from the DPE to the first DAE. SAS port 0 from I/O module 1 on the DPE to the second DAE.
Answer: A
Question #15 (Topic: )
What is a function of the ESRS Management Utility?
A. Adds VNX Block system to the centralized monitoring agent B. Applies the latest call home template to the Control Station C. Automatically adds all arrays in the domain D. Adds and approves Storage Processors A and B in Powerlink
Answer: A
Download Exam
Page: 3 / 48
Total 240 questions