How is the 19 inch PCIe Gen3 I/O Expansion Drawer connected on POWER8 systems?
Answer : C
Explanation:
PCIe3 x16 adapter provides two optical CXP ports for the attachment of two active optical cables (AOC). One adapter supports the attachment of one PCIe3 module in a PCIe Gen3
I/O Expansion Drawer.
References: https://www-
01.ibm.com/common/ssi/printableversion.wss?docURL=/common/ssi/rep_sm/5/877/ENUS
9119-_h05/index.html
A customer would like to freely move processor and memory activations from one Power
E870 system to another Power E870 system.
What is required to implement this capability?
Answer : C
Explanation:
With Power Enterprise Pools, IBM continues to enhance the ability to freely move processor and memory activations from one system to another system in the same pool, without the need for IBM involvement.
References: https://www-
01.ibm.com/common/ssi/ShowDoc.wss?docURL=/common/ssi/rep_sm/6/872/ENUS9119-
_h06/index.html&lang=en&request_locale=en
A customer with critical up-time requirements is comparing POWER8 Enterprise with
POWER8 Scale-Out servers.
Which of the following RAS features are found only on all of the POWER8 Enterprise servers?
Answer : A
Explanation:
References: http://www-01.ibm.com/common/ssi/cgi-
bin/ssialias?subtype=WH&infotype=SA&appname=STGE_PO_PO_USEN&htmlfid=POW0
3133USEN
What is an advantage of running Linux on Power compared to x86 technology?
Answer : D
Explanation:
Live Partition Mobility, a component of the PowerVM Enterprise Edition hardware feature, provides the ability to move AIX, IBM i, and Linux logical partitions from one system to another. The mobility process transfers the system environment that include the processor state, memory, attached virtual devices, and connected users.
References:
https://www.ibm.com/support/knowledgecenter/POWER7/p7hc3/iphc3kickoff.htm
A customer is comparing a Power Systems solution with an x86 solution for big data analytics.
Which no-change IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
Answer : B
Explanation:
Power Systems confidently delivers consistently high service levels across hundreds of virtual workloads on a single system.
Note: The IBM Systems Workload Estimator is a web-based sizing tool for IBM Power
Systems, System i, System p, System x, IBM Flex Systems, and IBM PureFlex Systems.
You can use this tool to size a new system, to size an upgrade to an existing system, or to size a consolidation of several systems.
The Workload Estimator (WLE) allows measurement input to best reflect your current workload and provides a variety of built-in workloads to reflect your emerging application requirements. Virtualization can be used to yield a more robust solution. The Workload
Estimator will provide current and growth recommendations for processor, memory, and disk that satisfy the overall client performance requirements.
References: http://m.ibm.com/http/www-947.ibm.com/systems/support/tools/estimator/
A stockbroker runs their high speed trading application on a standalone Linux system.
They would like to consolidate the trading workload onto an existing VIOS managed Power
E870. A single 10Gb Ethernet adapter is used for all the existing partitions.
Which of the following satisfies the customer requirement for minimum network latency for the trading workload?
Answer : B
Explanation:
To minimize network latency use a dedicated Ethernet adapter.
Note: Architectural view of the VIOS
A Power 770 MMD with two CEC enclosures 256GB of memory, and PCIe expansion drawers with SAS disk is being upgraded to a Power E870.
Which of the following is a valid process to leverage the existing client investment and maintain the existing serial number?
Answer : D
Explanation:
The following features that are present on the current system can be moved to the new system if they are supported in the Power E870 and E880:
Disks (within an EXP24S I/O drawer)
SSDs (within an EXP24S I/O drawer)
PCIe adapters with cables, line cords, keyboards, and displays
Racks -
Doors -
EXP24S I/O drawers -
For POWER7+ processor-based systems that have the Elastic CoD function enabled, you must reorder the elastic CoD enablement features when placing the upgrade MES order for the new Power E870 or E880 system to keep the elastic CoD function active. To initiate the model upgrade, the on/off enablement features should be removed from the configuration file before the MES order is started. Any temporary use of processors or memory owed to IBM on the existing system must be paid before installing the Power E870 or E880.
References: IBM Power Systems E870 and E880 Technical Overview and Introduction, page 28 http://www.redbooks.ibm.com/redpapers/pdfs/redp5137.pdf
A customer has a 40-core E880 with 2TB of memory installed with 10 cores and 1TB of memory activated. They want to move a Linux application from their x86 environment to the
E880. The application is supported on Linux on Power and requires 8 cores and 64GB of memory.
The Linux team is unfamiliar with the Power hardware.
Which of the following should be proposed to add the additional resources at the lowest cost?
Answer : D
Explanation:
Power Integrated Facility for Linux (Power IFL) is an optional lower cost per processor core activation for Linux-only workloads on IBM Power Systems. You can activate Power IFL processor cores that are restricted to running Linux workloads.
You can use shared processor pools to limit the use of processor capacity.
References: Power Systems, Power Integrated Facility for Linux (Power IFL), page 5 https://www.ibm.com/support/knowledgecenter/POWERLINUX/p7ecu/p8ega.pdf
Which of the following RAS features is always enabled and functional on an E870 / E880, regardless of configuration?
Answer : D
Explanation:
Processor Instruction Retry allows the system to recover from soft faults that otherwise result in outages of applications or the entire server.
Note: Within the processor core, soft error events might occur that interfere with the various computation units. When such an event can be detected before a failing instruction is completed, the processor hardware might be able to try the operation again by using the advanced RAS feature that is known as Processor Instruction Retry.
References:
To improve response times for an OLAP application, a customer requires a SAN-attached storage solution with microsecond latency and highest density per rack.
Which of the following supports these requirements?
Answer : D
Explanation:
IBM FlashSystem 900 is designed to provide scalable performance for the most demanding enterprise class applications, including virtualized or bare-metal OLTP and OLAP databases, virtual desktop infrastructures, technical computing applications, and cloud environments.
References: http://www.redbooks.ibm.com/abstracts/tips1261.html?Open
A customer with a Power 770 is planning a migration to an E870. The 770 has four 8Gb
PCIe 2-port Fibre Channel Adapters with all storage going through the SAN. The customer wants to keep the same WWPNs, and avoid a SAN reconfiguration.
What procedure should be recommended?
Answer : C
Explanation:
Power 770 has six PCIe Gen2 integraded adapter slots per building block, with a system maximum of 24.
Power E870 has eight PCIe Gen2 integraded adapter slots per building block, with a system maximum of 16.
Note:
A World Wide Port Name, WWPN, or WWpN, is a World Wide Name assigned to a port in a Fibre Channel fabric. Used on storage area networks, it performs a function equivalent to the MAC address in Ethernet protocol, as it is supposed to be a unique identifier in the network.
A worldwide port name (WWPN) is a unique 64-bit identifier that is assigned to a fibre channel node port, called an N_port. The storage area network (SAN) administrator assigns storage to a WWPN.
An HBA (host bus adapter) is an integrated circuit adapter or circuit board that is designed to provide physical connectivity between a computer host and storage devices or a network.
References: Power Systems Capacity on Demand, page 47
https://public.dhe.ibm.com/systems/power/docs/hw/p8/p8ha2.pdf
Which kind of accelerator technology do S824L server products use?
Answer : A
Explanation:
The CAPI can attach accelerators that have coherent shared memory access with the processors in the server and share full virtual address translation with these processors, using a standard PCIe Gen3 bus.
References:
A customer is considering a new POWER8 system. They want internal SSDs and HDDs to be virtualized to IBM i partitions using VIOS.
What should be considered when making this decision?
Answer : C
Explanation:
IBM i Host & Client partitions -
The creation of a Client partition leveraging iVirtualization consists of 2 main phases:
Compared with the X86 technology, What is the difference of using CAPI to implement
NoSQL memory database on POWER8?
Answer : D
A customer would like to add a second HMC to an environment which consists of multiple
POWER7 and POWER8 systems.
Which of the following is a requirement for both HMCs to be able to manage all the systems?
Answer : D
Explanation:
HMC Version 8 can be used for POWER8, POWER7, and POWER6 based servers.
HMC Version 7 can used for POWER7, POWER6 and POWER5 based servers.
References: https://www-304.ibm.com/support/customercare/sas/f/hmcl/home.html