IBM C9010-262 - IBM Power Systems with POWER8 Enterprise Technical Sales Skills V2 Exam
Page: 1 / 34
Total 165 questions
Question #1 (Topic: Topic 1)
A customer has a significant investment in open source software for performing in-memory
analytics ? This workload is currently deployed an Linux and recent x86 hardware.
What advantage would POWERS provide to this customer?
analytics ? This workload is currently deployed an Linux and recent x86 hardware.
What advantage would POWERS provide to this customer?
A. Up to two times the cores per socket
B. Up to eight times the ChipKill correction rate
C. Up to four times the memory bandwidth
D. Up to six times the PCte bandwidth
Answer: D
Question #2 (Topic: Topic 1)
Where should adapter configurations be validated before adding or rearranging adapter
A. HMC
B. SSIC
C. System Planning Tool
D. e-config
Answer: C
Question #3 (Topic: Topic 1)
A customer has older genet aborts of Power servers that they went to manage with their
E870 from the same 7042-CR8 HMC running V8R8.2.0.
What is the earliest Power server generation that is supported with this HMC level?
A POWER4
B. POWER7
C. POWER6
D. POWER8
E870 from the same 7042-CR8 HMC running V8R8.2.0.
What is the earliest Power server generation that is supported with this HMC level?
A POWER4
B. POWER7
C. POWER6
D. POWER8
Answer: D
Question #4 (Topic: Topic 1)
Which is a feature amiable with PowerVM that is not available with PowerKVM?
A. NFS storage support
B. Virtualization management through a CLI
C. Support for RHEL and SLES
D. HMC Attachment to Power Server
Answer: C
Question #5 (Topic: Topic 1)
Which of the following can be moved from a 770 to an EB70 when doing a migration?
A. EXP30 SSD I/O drawer
B. Memory DIMMs
C. PCIe 5802/5877 I/O drawer
D. EXP24S SFFGen2-bay drawer
Answer: C