IBM C9010-262 - IBM Power Systems with POWER8 Enterprise Technical Sales Skills V2 Exam
Page: 2 / 33
Total 165 questions
Question #6 (Topic: Topic 1)
A customer has ordered an E870. The system has been built, but cannot be shipped
What would prevent the system from being shipped?
What would prevent the system from being shipped?
A. The mandatory pre-install TDA has not been completed
B. The IBM System Support representative has not completed the pre-install site visit.
C. A pre-sale TDA discovered correctable issues that have not been corrected.
D. The opportunity owner has not released it.
Answer: B
Question #7 (Topic: Topic 1)
A customer is deploying an E870, which will operate with two client LPARs: each
configured with 16
Cores and 48GB memory. Application performance is a critical concern. The LPARs are
expected to grow by 25% over the next two years.
The System contains four 10Gb network adapters and four 16Gb FC adapters.
What would be the highest performing and least complex method of presenting storage and
networkingg?
configured with 16
Cores and 48GB memory. Application performance is a critical concern. The LPARs are
expected to grow by 25% over the next two years.
The System contains four 10Gb network adapters and four 16Gb FC adapters.
What would be the highest performing and least complex method of presenting storage and
networkingg?
A. Assign two FC and two Network adapters to the Client LPAp. Use Link Aggregation across ports on the Network adapters. Use Load Balanced Multjpathing across the ports on the FC adapter.
B. Assign two FC and two Network adapters to the Client LPARs. Use NIB across ports on the Network adapters. Use Load Balanced Multjpathing across the ports on the FC
C. Use Dual VIO Servers, each with two FC and two Network adapters. Use NIB on the Network adapters in VIOS. Use Link Aggregation ,n the Client LPARs. Use NPIV for Storage. Use NPIV for Storage
D. Use Dual VIO Servers, each with two FC and four Network adapters. Use Link Aggregation across ports on the Network adapters. Use SEA with Failover far Networking. Use NPIV for Storage.
Answer: D
Question #8 (Topic: Topic 1)
A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR.
Which needs to be shared between Four LPARs. Network and storage are being accessed
through SEA and NPIV.
In addition to assigning the adapter to the VIOS, what else needs to be done?
Which needs to be shared between Four LPARs. Network and storage are being accessed
through SEA and NPIV.
In addition to assigning the adapter to the VIOS, what else needs to be done?
A. Reassign the tape to client LPARs as needed.
B. Complete the vSCSl connectivity and map the tape to client partition
C. Assign the tape drive to the partitions.
D. Complete the NP1V connectivity and map the tape to client partition.
Answer: D
Question #9 (Topic: Topic 1)
A customer is considering shared processor pools.
Which of the following benefits can they expect to achieve?
Which of the following benefits can they expect to achieve?
A. Increased core utilization
B. Greater performance per core
C. Processor napping
D. Predictable core performance
Answer: C
Question #10 (Topic: Topic 1)
A customer is concerned about a Single Point of Failure (SPOF) because only one System
(SCU) is in their proposed E870 solution.
Which response should effectively address the customer's SPOF concern?
(SCU) is in their proposed E870 solution.
Which response should effectively address the customer's SPOF concern?
A. A redundant SCU can be added to the order.
B. Redundant SAN fibre connections are used to connect the SCU to the E870.
C. Redundant Virtual IO Servers will mitigate this concern
D. Redundant system Cocks and service processors are in the SCU
Answer: A