UiPath UiSTEPv1 - UiPath Software Testing Engineer Professional Exam

Question #11 (Topic: Exam A)
What is the purpose of scheduling a due date for manual executions in UiPath Test Manager?
A. To make sure a user is assigned to the manual execution. B. To track the progress of test cases and ensure the timely completion of manual testing tasks. C. To automatically execute test cases when the due date is reached. D. To make sure that if the date passes without running the test case log, the due date is automatically increased.
Answer: B
Question #12 (Topic: Exam A)
What is a good practice when creating a manual test step description?
A. The test step should contain a detailed description of the current screen B. The description should contain multiple actions for the expected behavior. C. The description should contain only test verifications. D. The description should contain a single action to be taken.
Answer: D
Question #13 (Topic: Exam A)
A developer has a test case created in Studio that is linked to a Test Data Queue in Orchestrator. Recently, the data in the Test Data Queue has been updated. What is the fastest way for the developer to test with the new test data?
A. Using ‘Run’ on the specific test case in the Test Explorer panel. B. Using ‘Run File’ on the specific test case in the Design tab. C. Right click on the test case in the Project panel + ‘Update Test Data’ + 'Run File’ on the specific test case in the Design tab. D. Using ‘Update Test Data’ + ‘Run’ in the Test Explorer panel.
Answer: D
Question #14 (Topic: Exam A)
What does the UiPath Azure DevOps extension enable users to do?
A. Create and manage UiPath robots directly from Azure DevOps projects. B. Run UiPath automated test cases from Azure DevOps pipelines. C. Develop and edit UiPath workflows using Azure DevOps as an integrated development environment. D. Generate detailed analytics reports on UiPath process performance in Azure DevOps.
Answer: B
Question #15 (Topic: Exam A)
What happens if the automated execution of a Test Set exceeds the 4-day default timeout?
A. The automated Test Execution is marked as Cancelled. B. The automated Test Execution is marked as Suspended. C. The automated Test Execution will continue to run indefinitely. D. The automated Test Execution will pause until resumed.
Answer: A
Download Exam
Page: 3 / 31
Total 153 questions