Question #1 (Topic: Exam A)
Optimization of risk management techniques that remove the security problem by eliminating the risk is known as risk:
A. avoidance. B. transfer. C. reduction. D. analysis.
Answer: A
Question #2 (Topic: Exam A)
A contractor that has installed a physical protection system should be required to repair, correct, or replace any defect for a minimum of:
A. 3 months. B. 6 months. C. 12 months. D. 24 months.
Answer: D
Question #3 (Topic: Exam A)
During a security survey, the largest portion of field work involves:
A. evaluating or drawing conclusions. B. analyzing hidden qualities, causes, or effects. C. verifying accuracy or validity of data collected. D. gathering data and accumulating evidence.
Answer: D
Question #4 (Topic: Exam A)
A project management team wants to use the best recognized way of understanding the true costs of a security system bid. Their best choice from the following list of methods is:
A. operating cost. B. procurement cost. C. installation cost. D. life-cycle cost.
Answer: D
Question #5 (Topic: Exam A)
Reviewing qualifications, checking references, and interviewing staff are all examples of what bid practice?
A. Staffing plan analysis B. Contract award C. Vendor selection D. Pre-bid conference
Answer: C