Certified Pega Business Architect (CPBA) 71V1 v6.0 (PEGACPBA71V1)

Page:    1 / 5   
Total 78 questions

How does an application determine the default action for a user at an assignment?

  • A. The connector flow action with the greatest likelihood value is the default action.
  • B. The flow action that is associated with the Default connector type in the flow is the default action.
  • C. The connector or local flow action with the greatest likelihood value is the default action.
  • D. The connector or local flow action that appears first when listed alphabetically is the default action.


Answer : D

Which of the following is a Best Practice when efficiently building a Pega application?

  • A. Create custom HTML code for a section
  • B. Reuse rules when updating an application
  • C. Create a property to control the status of work
  • D. Add custom buttons to a section


Answer : A

In Designer Studio, the Application Explorer displays ____________________.

  • A. the data structure only
  • B. the class tree and rules organized by the classes they apply to
  • C. all the rules used by all applications
  • D. the class structure only


Answer : C

One application development guardrail limits the number of shapes(excluding connectors) in a flow rule. Why should a flow rule obeys this limit?

  • A. Flows with too many shapes cannot be updated
  • B. Flows with too many shapes cannot be saved
  • C. Limiting the number of shapes allows developers and end users to more easily understand the process
  • D. Adding too many shapes in one flow rule may result in performance issues


Answer : C

(True/False) A new Pega 7 application can be built on top of an already existing Pega
7application.

  • A. True
  • B. False


Answer : A

Select the types of documentation that the Application Document wizard can produce.
(Choose three)

  • A. An application profile document
  • B. An entity relationship document
  • C. A specification document
  • D. A requirements document
  • E. Application documentation
  • F. A training manual


Answer : A,C,E

Given the following scenario for property insurance claims, which type of decision rule should be used to configure the decision?
After a property insurance claim has been filed, any claim that involves flood damage must be reviewed by a flood claim specialist before being sent to a claims adjuster. All other property insurance claims can be sent to the claims adjuster without this step.

  • A. When
  • B. Constraints
  • C. Decision Table
  • D. declare Expressions


Answer : B

Which flow shape is used to start a subflow from a main flow, and waits until the subflow completes before the main flow continues?


  • A. ShapeA
  • B. Shape B
  • C. Shape C
  • D. Shape D


Answer : D

A flow action typically references a ________ .

  • A. Section
  • B. Cell
  • C. Layout
  • D. Harness


Answer : C

A fully stated requirement with no missing information is ____________ .

  • A. current
  • B. cohesive
  • C. complete
  • D. consistent


Answer : B

Verifiability of a requirement means the requirement _____________.

  • A. must include information that establishes a testable condition
  • B. clearly defines all the information necessary to describe the feature or behaviordesired
  • C. must be well documentedand concise
  • D. has been agreedupon by both business and IT leadership


Answer : D

Section rules can be nested (referenced) in ________________ .

  • A. Harnesses, Flow Actions, and Sections
  • B. Harnesses and Flow Actions only
  • C. Flow Actions and Sections only
  • D. Any UI rule type


Answer : D

Select three ways that correspondence can be generated from a work item during a flow.
(Choose three)

  • A. Whenoperator processes an assignment by choosing the local action called SendCorrespondence
  • B. When a work item reaches a correspondence shape
  • C. When the work item reachestheEnd shape
  • D. When the work item reaches an assignment with a notification configured
  • E. When a work item reaches an integration shape
  • F. When the work item reaches a SendEmail smart shape


Answer : B,D,F

Review the following decision table.


If the credit score is 800 and the outstanding balance is 1000, what is the result of the decision?

  • A. Level3
  • B. Level1
  • C. Reject
  • D. Level2


Answer : D

Case type A requires a manual series of steps be taken when an instance of A is rejected.
Select the best approach to model this requirement in the case design.

  • A. Add an optional process on a primary stage to handle the rejection process by instantiating a new case type, B.
  • B. Add an optional action on a primary stage of case type A to handle the rejection process.
  • C. Add an alternate stage to the case type A to handle the rejection process.
  • D. Add an optional process on an alternate stage to handle the rejection process.


Answer : C

Page:    1 / 5   
Total 78 questions