What is the SLA period for a backup Analysis Engine Report?
A. one business day
B. ten business days
C. five business days
D. the backup period is not defined but has a guideline of ten working days
Answer: C
Question #7 (Topic: )
Which method is used to transfer data with Butterfly?
A. private file sharing websites
B. via e-mail to Butterfly Support
C. access to http://www.butterflyportal.net
D. access to https://www.butterflyportal.net
Answer: B
Question #8 (Topic: )
Which access right(s) must be available for the user to run the collector?
A. any access level
B. guest privilege access
C. only root or administrative access
D. system privilege with access to the backup application binaries
Answer: C
Question #9 (Topic: )
What is Data Eligible for Migration?
A. Data that is under retention for more than 3 months as it must be left to expire.
B. Data migration requirements as defined in the Target Design Guidance document.
C. Data that has been verified as retrievable from the source environment and can be migrated.
D. Data types/operating systems supported by the Migration Engine that will not expire within 3 months.
Answer: C
Question #10 (Topic: )
What happens when a Target Design Guidance document is uploaded?
A. The design cannot be changed.
B. The collectors will become available for download.
C. Butterfly will start producing the Analysis Engine Report.
D. Only the design from the finalized Target Design Guidance will be used.
Answer: B