HP HPE0-S51 - Building HPE Data Center Solutions Exam
Page: 1 / 24
Total 118 questions
Question #1 (Topic: Topic 1)
You are working in a data center with multiple servers and need to update the iLO 5 user names and passwords on a regular basis.
Which tool enables you to streamline and automate this process?
Which tool enables you to streamline and automate this process?
A. iLO Amplifier Pack
B. Central Management Console
C. Agentless Management
D. RESTful API
Answer: A
Question #2 (Topic: Topic 1)
You are troubleshooting a POST error on a HPE ProLiant rack-mount server. HPE support has directed you to test a minimum hardware configuration.
Which components should you remove? (Choose two.)
Which components should you remove? (Choose two.)
A. CMOS battery
B. all cooling fans
C. all expansion boards
D. all external storage media
E. redundant processors
Answer: DE
Question #3 (Topic: Topic 1)
When should you use the HPE Switch Selector?
A. when you need to list the price information of the switches
B. when you need to select a switch VLAN configuration
C. when you need to compare features between multiple switches
D. when you need to perform a competitive analysis between vendors
Answer: C
Question #4 (Topic: Topic 1)
A customer needs a solution that will maintain the data availability in their campus location. They require a multi-node system that can sustain failures, including a
full building outage.
Which HPE storage platform meets the customer’s needs?
full building outage.
Which HPE storage platform meets the customer’s needs?
A. StoreVirtual
B. StoreEasy
C. MSA
D. Nimble
Answer: C
Question #5 (Topic: Topic 1)
DRAG DROP
Match the HPE Tool with its use case. Select all that apply.
Select and Place:
[HP-HPE0-S51-1.0/xmlfile-4_1.png]
Match the HPE Tool with its use case. Select all that apply.
Select and Place:
[HP-HPE0-S51-1.0/xmlfile-4_1.png]
Answer: [HP-HPE0-S51-1.0/xmlfile-4_2.png]