Integrating HPE Synergy Solutions v1.0 (HPE0-S50)

Page:    1 / 4   
Total 58 questions

A Synergy integrator is unable to assign an HPE 3PAR Virtual Volume to a new server profile in HPE OneView. The Virtual Volume has been previously assigned to another profile.
Which setting in HPE OneView is preventing the integrator from assigning the volume to the new profile?

  • A. shared under storage pools
  • B. private under volumes
  • C. private under storage pools
  • D. shared under volumes


Answer : B

As part of a Synergy implementation, a Synergy integrator needs to create 100 networks in a Logical Interconnect Group (LIG) configuration. The network administrator for the end-of-row (EoR) switches provides a CSV file with the network that need to be created.
How should the Synergy integrator automate the creation of the 100 networks?

  • A. Upload the CSV file to the Composer and execute the Create Network wizard.
  • B. Use the HPE OneView PowerShell library to create the networks listed in the CSV file.
  • C. Start HPE SUT to migrate the CSV file to a Synergy configuration file and upload it to the composer.
  • D. Configure Image Streamer to automate the network configuration.


Answer : B

Which component of the HPE Synergy solution provides a customer with the ability to rapidly provision a consistent operating environment?

  • A. OpenView
  • B. Reference Architecture
  • C. Composer
  • D. Image Streamer


Answer : C

When should IP addresses be assigned using an IPv4 address pool in the Composer? (Choose two.)

  • A. when configuring management NICs in an operating system
  • B. when booting to an iSCSI initiator with Image Streamer
  • C. when PXE booting from the deployment server
  • D. when configuring Composer appliances
  • E. when configuring interconnect modules


Answer : BC

A Synergy integrator is configuring an HPE Synergy environment with two HPE Virtual Connect SE 40Gb F8 modules. The Synergy integrator has four 40Gb uplinks connected to two upstream switches and needs all compute modules to share the full 160Gb of available bandwidth. The upstream switches are interconnected in a virtual port channel (vPC) pair.
What should the integrator do to ensure that the switch configuration does not result in a network loop?

  • A. Cross connect the Virtual Connect modules to the upstream switches and select all four 40Gb ports for the uplink. Virtual Connect will automatically configure the Multimodule Link Aggregation Group (MLAG).
  • B. Create two separate Virtual Connect uplinks. Select two ports from each module for each uplink. Configure spanning tree protocol (STP) on both Virtual Connect uplinks to default to port forward mode.
  • C. Cross connect the Virtual Connect modules to the upstream switches and select all four 40Gb ports for the uplink. Configure spanning tree protocol (STP) on the Virtual Connect uplink to default to port forward mode.
  • D. Create two separate Virtual Connect uplinks. Select one port from each module for each uplink. Use two separate Logical interconnect Groups (LIGs) to keep the uplinks from looping.


Answer : B

Where can a Synergy integrator find consolidated information describing environmental requirements, configuration scenarios, and installation preparation needs for the HPE Synergy solution?

  • A. HPE QuickSpecs
  • B. HPE Synergy Site Planning Guide
  • C. HPE SalesBuilder for Windows
  • D. HPE Synergy Planning Tool


Answer : C

A Synergy integrator has installed a new frame into a rack with two existing frames in the customer"™s environment.
Click where the integrator should verify that the cabling for the management ring was completed correctly.
Hot Area:




Answer :

A customer needs increased available bandwidth and highly available network Virtual Connect interconnects.
Which two steps must the Synergy integrator perform in the configuration to meet the customer"™s needs? (Choose two.)

  • A. Link Ports L1 and L4 on Master ICMs to ports L1 and L2 on the first Satellite ICM.
  • B. Install Redundant Frame Link Modules and a second management ring.
  • C. Enable Multimodule Link Aggregation Group (MLAG).
  • D. Enable Intelligent Resilient Fabric (IRF) on the Virtual Connect Modules.
  • E. Connect Ports Q7 and Q8 on the Master Interconnect Modules (ICM).


Answer : AD

A Synergy integrator is modifying the network uplink configuration of a Synergy environment that uses HPE Synergy 40Gb F8 Switch Modules for connectivity.
What must the Synergy integrator do to make the necessary modifications?

  • A. Connect to the switch module CLI and run the necessary configuration commands.
  • B. Connect to the end-of-row (EoR) switches and push the configuration to the switch modules.
  • C. Connect to HPE OneView running on the Composer module to modify the Logical Interconnect Group (LIG) configuration.
  • D. Connect keyboard, monitor, and mouse to the Frame Link module, and run the network configuration wizard.


Answer : D

A customer has moved a USB bootable drive to another compute module but the compute module fails to boot from the USB device.
What should the Synergy integrator do to resolve this issue?

  • A. In the server Profile, make sure OS Deployment is set to Deployment Plan.
  • B. Use UEFI System Utilities to disable the B140i RAID controller.
  • C. Verify that the USB drive key is enabled in UEFI System Utilities.
  • D. Make sure PXE boot is disabled.


Answer : B

What should a Synergy integrator do to resolve an unresponsive HPE Synergy Frame Link Module?

  • A. Press the reset button on the front of the HPE Synergy Frame.
  • B. Remove and reinstall the Frame Link Module in the original bay.
  • C. Remove and reinstall the Composer.
  • D. Disconnect and reconnect the Frame Link Module from the management network.


Answer : B

Which element of the HPE Synergy 12000 Frame protects against loops on the MGMT ports that are connected to the external management network?

  • A. Image Streamer
  • B. Frame Link Modules
  • C. Interconnect Modules
  • D. Composer


Answer : A

A Synergy integrator is working with a customer to perform a first-time setup of a 3-frame Synergy environment. The following fabric modules are installed:

Frame 1 -
-> Bay 1 "" HPE Synergy 12Gb SAS Connection Module
-> Bay 2
-> Bay 3 "" HPE Virtual Connect SE 40Gb F8 Module
-> Bay 4 "" HPE Synergy 12Gb SAS Connection Module
-> Bay 5
-> Bay 6 "" HPE Synergy 20Gb Interconnect Link Module

Frame 2 -
Bay 1 "" HPE Synergy 12Gb SAS Connection Module


-> Bay 2
-> Bay 3 "" HPE Synergy 20Gb Interconnect Link Module
-> Bay 4 "" HPE Synergy 12Gb SAS Connection Module
-> Bay 5
-> Bay 6 "" HPE Virtual Connect SE 40Gb F8 Module

Frame 3 -
-> Bay 1 "" HPE Synergy 12Gb SAS Connection Module
-> Bay 2
-> Bay 3 "" HPE Synergy 20Gb Interconnect Link Module
-> Bay 4 "" HPE Synergy 12Gb SAS Connection Module
-> Bay 5
-> Bay 6 "" HPE Synergy 20Gb Interconnect Link Module
How many HPE Synergy Interconnect Link 3 meter Active Optical Cables must be installed to ensure proper functionality?

  • A. 4
  • B. 8
  • C. 12
  • D. 16


Answer : A

A customer has forgotten the password for the HPE OneView Appliance controlling the customer"™s HPE Synergy Infrastructure.
Where can the customer reset the password with the assistance of HPE Support?

  • A. Maintenance Console screen
  • B. FLM Access to Synergy Console
  • C. Virtual Center server
  • D. Front Access Panel to Synergy Console


Answer : A

A Synergy integrator needs to add more NICs to a server profile.
What does the integrator need to be aware of when performing this action?

  • A. The host needs to be powered off to activate the change.
  • B. The Virtual Connect modules need to be rebooted once the profile is applied.
  • C. The server profile template must be changed before modifying the server profile.
  • D. The host networks will go offline when the profile is assigned.


Answer : C

Page:    1 / 4   
Total 58 questions