HP HPE0-S22 - Architecting Advanced HPE Server Solutions Exam
Page: 3 / 12
Total 60 questions
Question #11 (Topic: )
A customer is deploying HPE Apollo Systems, which the customer hopes will help the
organization achieve its goals for efficient energy operations. In assessing the customer
maturity, the architect finds that IT staff has limited insight into how efficiently servers are
operating and limited ability to enforce energy efficiency policies.
Which solution should the architect recommend to help solve these issues?
organization achieve its goals for efficient energy operations. In assessing the customer
maturity, the architect finds that IT staff has limited insight into how efficiently servers are
operating and limited ability to enforce energy efficiency policies.
Which solution should the architect recommend to help solve these issues?
A. HPE Advanced Power Manager
B. HPE OneView 2.x
C. HPE Power Advisor
D. HPE Insight Remote Support
Answer: A
Question #12 (Topic: )
A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GB
of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual
volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the
MS-SQL database is performing poorly.
After extensive performance trending analysis, it is determined that the database front-end
I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess
30ms at critical times.
Which solution should the architect recommend to resolve the performance issue with
consideration to cost and complexity?
of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual
volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the
MS-SQL database is performing poorly.
After extensive performance trending analysis, it is determined that the database front-end
I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess
30ms at critical times.
Which solution should the architect recommend to resolve the performance issue with
consideration to cost and complexity?
A. Increase the memory on the blades to 2TB.
B. Install SSD drives local to the BL460c.
C. Install an HPE IO Accelerator on the blade.
D. Add Adaptive Optimization licensing.
Answer: B
Question #13 (Topic: )
An architect needs to demonstrate the financial advantages of a proposed HPE server and
Hypervisor-based solution compared to a legacy server environment that has traditional
servers and desktops.
Which tool should the architect use?
Hypervisor-based solution compared to a legacy server environment that has traditional
servers and desktops.
Which tool should the architect use?
A. Hyperscale Business Value Calculator
B. Client Virtualization ROI Calculator
C. HPE Business Technology Optimization
D. HPE Business Process Monitor
Answer: A
Question #14 (Topic: )
An architect proposes an HPE Moonshot server solution for a customer. The customer
needs a single processor solution with a network switch to allow 10Gb connectivity and
support for a software-defined network solution.
Which HPE Moonshot switch module meets the customers needs?
needs a single processor solution with a network switch to allow 10Gb connectivity and
support for a software-defined network solution.
Which HPE Moonshot switch module meets the customers needs?
A. 180G Switch Module
B. 45Gc Switch Module
C. 45XGc Switch Module
D. 45G Switch Module
Answer: C
Question #15 (Topic: )
View the Exhibit.
[HP-HPE0-S22-7.0/HP-HPE0-S22-9_2.png]
[HP-HPE0-S22-7.0/HP-HPE0-S22-9_3.png]
Refer to the exhibit. An architect is planning an HPE Moonshot System with m710
cartridges to support a customer application virtualization solution. The customer indicated
that the maximum acceptable response time for the solution is three seconds. The architect
has implemented a POC
and tested a single cartridge with different numbers of user sessions.
The architect monitored resource utilization throughout the tests. The results of the test
with the point at which the response time exceeded three seconds are shown, marked as
the "VSI max."
What should the architect conclude from this test?
[HP-HPE0-S22-7.0/HP-HPE0-S22-9_2.png]
[HP-HPE0-S22-7.0/HP-HPE0-S22-9_3.png]
Refer to the exhibit. An architect is planning an HPE Moonshot System with m710
cartridges to support a customer application virtualization solution. The customer indicated
that the maximum acceptable response time for the solution is three seconds. The architect
has implemented a POC
and tested a single cartridge with different numbers of user sessions.
The architect monitored resource utilization throughout the tests. The results of the test
with the point at which the response time exceeded three seconds are shown, marked as
the "VSI max."
What should the architect conclude from this test?
A. CPU becomes a limiting factor around 50 sessions, so the architect should propose at least one cartridge per 45 or 50 users.
B. None of the monitored resources shows signs of being a bottleneck, so the architect should consider other factors such as the HPE Moonshot switch module.
C. The network adapter becomes a bottleneck before other resources, so the architect should propose m710pcartridges, which provide 10GbE ports.
D. The memory becomes a bottleneck before other resources, so the architect should propose m400cartridges, which provide a higher memory capacity.
Answer: C