HP HP2-Z12 - Servicing HP Networking Products Exam

Question #6 (Topic: )
You are installingan HP E5406 zl switch in a customer'snetwork.The network administrator
tells you that she wants some staff members to have read-only access to the switch. Which
privilege level should those staff members be assigned?
A. operator B. manager C. privileged EXEC D. user EXEC
Answer: A
Question #7 (Topic: )
The LED above a port on an HP A Series switch is blinking yellow, and the mode LED is
blinking green. What does this indicate?
A. The port has failed the switch’s power on self test (POST). B. The port is operating in half-duplex mode. C. The port is transmitting data at 10/100 Mbps. D. The device connected to the port is non-Power over Ethernet (PoE) compliant.
Answer: A
Question #8 (Topic: )
On HP V1405 C and V1405 Desktop switches, click the location that is illuminated to
indicate that the switch is powered on.
[HP-HP2-Z12-6.1/HP-HP2-Z12-5_2.png]
Answer: [HP-HP2-Z12-6.1/HP-HP2-Z12-5_3.png]
Question #9 (Topic: )
Which feature does the HP V1910 switch offer that no other HP V Series switches do?
A. Gigabit connectivity B. A CLI C. PoE D. static routing
Answer: D
Question #10 (Topic: )
You are sent by the response center to install an HP E2610 switch at a customer site. After
you install the switch in the rack and power it on, you connect to the CLI through the
console port. You then assign the switch an IP address of 10.1.1.20/24.
When you enter these commands, which part of the switch will be dynamically updated?
A. firmware image B. non-volatile RAM C. startup-config D. running-config
Answer: B
Download Exam
Page: 2 / 19
Total 94 questions