During a Storage Center dual-controller upgrade from SC030 to SC8000, the onsite engineer fails to reload the configuration to flash on a controller.
What is the result?
Answer : D
An engineer is configuring fault domains and front-end IO ports on a dual controller storage array. Any volumes that are later created and mapped to a server must be active/optimized on one controller and standby on the other controller.
Which port mode should the engineer use to meet this requirement?
Answer : C
Which two steps should the engineer take prior to racking any equipment? (Choose two.)
Answer : B,D
A Storage Administrator wants to do a Storage Center OS update to SCOS version 6.7.5.
The Storage Center is currently at SCOS version 6.5.30. The Storage Center is at a secure facility and does NOT allow connectivity to any network outside the facility. The Storage
Administrator is trying to use the Storage Center Update Utility to accomplish this task, but has been unsuccessful in doing so.
Why has the Storage Administrator been unsuccessful?
Answer : D
In the setup wizard, which three options are available to choose how the Storage Center handles software updates? (Choose three.)
A. Download and apply software updates automatically.
B. Download software updates automatically and notify me.
C. Notify me of a software update but do not download automatically.
D. Search for the ISO file and download automatically.
E. Do not automatically check for software updates.
Answer : B,C,E Topic 2, Exam Set 2
Regardless of the redundancy type selected, which three RAID types are supported by Dell
Storage Center? (Choose three.)
Answer : B,C,D
An administrator has multiple servers that need to be connected to the Storage Center through two iSCSI networks. The engineer uses a software iSCSI initiator on the servers.
The Storage Center runs in Virtual Port mode.
What item(s) must the administrator know to connect the hosts to the? Storage Center?
Answer : D
An engineer has multiple servers connected to the Storage Center through two iSCSI networks. The engineer uses a software iSCSI initiator on the servers. The Storage Center runs in Virtual Ports mode.
Which IP address is required in the iSCSI initiator for proper connectivity?
Answer : A
An engineer wants to perform a Storage Center OS ISO update, but must determine the
BMC IP address first In what two ways can the engineer determine the BMC IP address?
(Choose two )
Answer : B
An administrator needs to replicate data to an off-site Storage Center. Data on both sides must always match The administrator must have the data sent to the remote system as soon as the data is written. If the communication to the remote system fails, ail writes to the local system must stop
Which option should the administrator choose to meet the requirements?
Answer : A
An engineer is testing controller failover on a newly installed Storage Center . Which process should the engineer use?
Answer : D
A Storage Center system has 6 connections to a FC switch. The Storage Center is in
Virtual Port mode. How many members are in a server zone?
Answer : A
A site has multiple storage administrators. Some administrators need to be limited to manage only specific volumes. The administrator should be able to create and present volumes within the administrator's area. Those administrators should NOT be able to see any other volumes created in the Storage Center.
How should the deployment engineer accomplish tins task?
Answer : D
Refer to the exhibit.
Answer : C
Refer to the exhibit.
Answer : C,D