Regarding the process described above, what is the most important recommendation you would make using IEEE 1044 as a guide? 2 credits
A. No priority or severity assigned
B. Incident numbering is manual rather than automated
C. No mentioning of reproduceability
D. No classification on type of incident
Answer : A Topic 12, Scenario 12 Automatic Teller Machine (ATM) You are a test manager in charge of integration, system and acceptance testing for a bank. You are working on a project to upgrade an existing ATM to allow customers to obtain cash advances from supported credit cards. The system should allow cash advances from 20 to 500, inclusively, for all supported credit cards. The supported credit cards are American Express, VISA, Eurocard and Mastercard. In the master test plan the following items are listed in the section named items and/or I All supported credit cards II Language localization II Valid and invalid advances IV Usability V Response time
Relying only on the information provided in the scenario, select the TWO items and/or features for which sufficient information is available to proceed with test design. 2 credits
Answer : A,C
Continuing with the Scenario described in the previous question, which of the following topics would you need to address in detail in the master test plan? 3 credits
Answer : A
Given the following figures for the testing on a project, and assuming the failure rate for initial tests remains constant and that all retests pass, what number of tests remain to be run? 3 credits
Answer : B
Given is the following defect removal chart reported at the end of system testing - showing total defects detected and closed defects (fixed and successfully retested). A number of open defects are classified as critical. All tests have been executed.
Based on the chart above, what is the most appropriate next test phase? 1 credit
Answer : D
Which option is part of the implementation and execution area of the fundamental test process?
Answer : B
Explanation:
A. is part of Analysis and design.
C. is part of Evaluating exit criteria and reporting.
D. is part of Test closure activities.
The five parts of the fundamental test process have a broad chronological order. Which of the options gives three different parts in the correct order?
Answer : B
Explanation:
All other answers have at least one stage of the fundamental test process in the wrong sequence.
Which statement is most true?
Answer : A
Explanation:
This is a restatement of the testing principle Testing is context dependent
A bug or defect is:
Answer : C
The effect of testing is to:
Answer : B
What is retesting?
Answer : D
Which of the following is correct?
Debugging is:
Answer : C
Explanation:
A. Is a brief definition of testing.
B. Is retesting.
D. Is regression testing.
When is testing complete?
Answer : B
Explanation:
Sometimes time/money does signify the end of testing, but it is really complete when everything that was set out in advance has been achieved.
Which list of levels of tester independence is in the correct order, starting with the most independent first?
Answer : C
Explanation:
This option has someone nearer to the written code in each statement. All other options are not in this order.
Which of the following is in the correct order (typically)?
Answer : A