Question #11 (Topic: )
A periodic time frame can be used to arrange for Control Limit and Center Line calculations
with good SPC implementation in a process.
with good SPC implementation in a process.
A. True
B. False
Answer: A
Question #12 (Topic: )
The data on SPC charts are typically constructed such that they have the most recent data
point on the right hand side.
point on the right hand side.
A. True
B. False
Answer: A
Question #13 (Topic: )
Which statement(s) describe an undesirable situation when implementing SPC?
A. The lower Control Limit for the R chart is equal to zero
B. Attempt to use SPC for tracking transaction times at a warehouse
C. A process is in Statistical Control before implementation of SPC
D. The Control Limits are wider than the customer specification limits
Answer: D
Question #14 (Topic: )
If a process has Outliers which pair of charts is most preferable if subgroups will exist for
the Continuous Data?
the Continuous Data?
A. Individual—Moving Range
B. Xbar-R Charts
C. Xbar-S Charts
D. nP and P Charts
Answer: B
Question #15 (Topic: )
After a Belt has put data through the smoothing process which chart would be used to look
for trends in the data?
for trends in the data?
A. Moving Average Chart
B. Multi-Vari Chart
C. X bar Chart
D. Pareto Chart
Answer: A