Question #11 (Topic: )
A customer is purchasing a new POWER8 Scale-out server and desires three years of
hardware maintenance with 24 hour by 7 day coverage.
Which option satisfies this request?
hardware maintenance with 24 hour by 7 day coverage.
Which option satisfies this request?
A. Upgrade from the standard warranty of one year 9 by 5, to three years of 24 by 7 coverage.
B. Upgrade the standard warranty of three years 9 by 5 coverage to 24 by 7.
C. The standard warranty is for three years with 24 by 7 coverage.
D. Upgrade from the standard warranty of one year 24 by 7, to three years of coverage.
Answer: D
Question #12 (Topic: )
A customer will order a POWER8 hardware solution that was proposed.
Which of the following should be used to create and submit the appropriate hardware
solution to IBM manufacturing?
Which of the following should be used to create and submit the appropriate hardware
solution to IBM manufacturing?
A. e-config
B. System planning tool
C. IBM Lab Services
D. HMCscanner
Answer: A
Question #13 (Topic: )
A customer is running SAP HANA on Intel x86 servers. Workload requirements have
outgrowth the current environment.
The customer is considering replacing their Intel x86 environment with IBM POWER8
processor-based servers.
What are some major reasons that the customer should consider Power Systems over
x86?
outgrowth the current environment.
The customer is considering replacing their Intel x86 environment with IBM POWER8
processor-based servers.
What are some major reasons that the customer should consider Power Systems over
x86?
A. Red Hat Enterprise Linux support for SAP HANA and the flexibility to run IBM AIX, IBM i and Canonical Ubuntu.
B. Per core performance of POWER processor-based systems and price/performance.
C. Coherent Accelerator Processor Interface (CAPI) coupled with Flash Storage and processor clock speed.
D. Mission critical reliability, flexibility, virtualization.
Answer: D
Question #14 (Topic: )
An existing IBM Power Systems customer has POWER7 servers and an older HMC. They
want to add an E870.
What is the minimum HMC hardware version they must be running for the latest HMC code
to support their new server?
want to add an E870.
What is the minimum HMC hardware version they must be running for the latest HMC code
to support their new server?
A. 7042-CR9
B. 7042-CR5
C. 7042-CR8
D. 7042-CR4
Answer: A
Question #15 (Topic: )
What elements of POWER8 technology can be exploited by software developers to
optimize performance on an E870?
optimize performance on an E870?
A. First Failure Data Capture (FFDC) and Service processor
B. Hypervisor and Thermal Power Management Device (TPMD)
C. Transactional memory and SMT
D. Active Memory Expansion and storage keys
Answer: D