IBM C2020-635 - IBM Cognos 10 BI OLAP Developer Exam

Question #1 (Topic: )
When the model contains two data sources that provide date values, how can the
developer avoid ambiguity whenTransformer sets the current time period?
A. Disable the data source's ability to set the current time period. B. Assign the current date (obtained from the system clock) as the current period. C. Let Transformer assign the date closest to the model'screation date as the current period. D. Enter the initial current period and adjust it to match the system date and time.
Answer: A
Question #2 (Topic: )
Where can a developer change relationships to create a structure different from what the
data suggests?
A. Categories Diagram B. Dimension Map C. Data source property sheet D. Level property sheet
Answer: A
Question #3 (Topic: )
What must be done to make the cube data available in Analysis Studio?
A. Use the PowerCube Connection Utility to publish thecube. B. Create a data source connection to the cube in Transformer. C. Publish the PowerCube as a data source and a package. D. Generate a package that contains a data source connection to the cube.
Answer: C
Question #4 (Topic: )
A developer added a manuallevel in the time dimension. During category generation, the
developer gets a warning that Transformer is not able to relate the categories to the parent
levels. What must be done to ensure Transformer relates the categories correctly?
A. Specify a date function for each level. B. Specify date input format. C. Specify an Invalid Dates category. D. Specify a time-state rollup.
Answer: A
Question #5 (Topic: )
What can be done if a regular time dimension is added to a model, and the levels Year,
Quarter,and Month are not automatically generated?
A. Set the date input format for the time dimension. B. Set the data class of the source category to Date. C. Change the numeric time sequence for each level. D. Create a non-standard time dimension with thenew levels.
Answer: B
Download Exam
Page: 1 / 13
Total 65 questions