Question #1 (Topic: Topic 1)
How do you ensure that PP/DS planned orders retain the end date and quantity of
previously created SNP orders?
A. Enter the same value for the SNP production horizon and PP/DS horizon. B. Activate "determine date and quantity based on SNP order" in Model and Version Management for PP/DS. C. Use transaction /SAPAPO/SNP2PPDS or interactive function "SNP order conversion". D. Maintain the SNP production horizon to start at least 1 day before the PP/DS horizon ends.
Answer: C
Question #2 (Topic: Topic 1)
Which of the PP/DS options can you configure in Model and Version Management?
Note: There are 3 correct answers to this question.
A. Plan explosion B. Available stock types C. PP/DS horizon D. No order without source of supply E. Priority determination
Answer: C,D,E
Question #3 (Topic: Topic 1)
Which group of options is possible in SCM GATP but not in ATP in ECC?
A. ATP check with checking horizon, ATP check at sublocation level, ATP check at batch level B. Backorder processing, Automated mass ATP check, ATP check for deliveries C. Check against ATP time series, Check against forecast, Check against allocation D. Combined check of basic methods, Ability to trigger multilevel production, Rules-based ATP framework
Answer: D
Question #4 (Topic: Topic 1)
In what situations do you use SAP SCM APO instead of SAP ECC PP?
Note: There are 3 correct answers to this question.
A. When MRP planning logic is mandatory during a planning run B. When enhanced capacity planning capabilities are needed C. When alert messages need to be updated in a planning session that has not been saved D. When the low-level-code calculation is needed for all BOM structures E. When dependent requirements need time stamp information
Answer: B,C,E
Question #5 (Topic: Topic 1)
You want to define virtual safety stock within PP/DS.
Which statements correctly describe this kind of modeling?
Note: There are 3 correct answers to this question.
A. The virtual safety stock is only "virtually" visible for the MRP run and is not included in the pegging logic. B. The virtual safety stock requires a separate PP/DS heuristic to become visible as a requirement during the MRP run. C. The virtual safety stock is only considered in the dynamic pegging logic. D. As soon as the material master has a safety stock value assigned, a virtual safety stock is considered during planning. E. The virtual safety stock logic can only be defined for an entire planning version.
Answer: A,B,E