VMware 5V0-31.22 - VMware Cloud Foundation Specialist (v2) Exam
Page: 2 / 28
Total 139 questions
Question #6 (Topic: Exam A)
Which two roles are played by a Spherelet in a Tanzu-enabled VCF workload domain? (Choose two.)
A. It starts and monitors vSphere pods running on the workload domain cluster.
B. It communicates with the vSphere with Tanzu embedded Harbor registry.
C. It runs as a VIB on all Supervisor Cluster ESXi hosts configured with the vSphere Networking Stack.
D. It enables an ESXi hypervisor to act as a Kubernetes master node.
E. It enables an ESXi hypervisor to act as a Kubernetes worker node.
Answer: CE
Question #7 (Topic: Exam A)
A systems administrator is tasked with creating a new VI workload domain that will leverage either an external NFS or a VMFS on FC storage as the principal storage.
Which action is required to fulfill this requirement?
Which action is required to fulfill this requirement?
A. Create a new network pool for vMotion and NFS networks.
B. Create a new network pool for vMotion, vSAN, and NFS networks.
C. Create a new network pool only for vMotion network.
D. Create a new network pool for vMotion and vSAN networks.
Answer: A
Question #8 (Topic: Exam A)
An architect is presented with a Bill of Material for different vSAN ready nodes:
8 identical nodes with 1 vSAN disk group
8 identical nodes with 2 vSAN disk groups
What is the ideal design of VMware Cloud Foundation domains that the architect should recommend?
8 identical nodes with 1 vSAN disk group
8 identical nodes with 2 vSAN disk groups
What is the ideal design of VMware Cloud Foundation domains that the architect should recommend?
A. 1 Management Domain of 6 Nodes, 1 Workload Domain of 4 nodes, and 1 Workload Domain of 6 nodes
B. 1 Management Domain of 6 nodes and 1 Workload Domain of 10 nodes
C. 1 Domain of 16 nodes deployed on a Consolidated Architecture model
D. 1 Management Domain of 4 nodes, 1 Workload Domain of 4 nodes, and 1 Workload Domain of 8 nodes
Answer: D
Question #9 (Topic: Exam A)
Which order of steps should an administrator use to replace a failed host in a stretched cluster?
A. 1.Decommission the failed host.
2. Remove the host using cluster APIs.
3. Add the newly commissioned host to the cluster using cluster APIs.
4. Commission the new host with the correct network. B. 1. Decommission the failed host.
2. Remove the host using cluster APIs.
3. Commission the new host with the correct network.
4. Add the newly commissioned host to the cluster using cluster APIs. C. 1. Remove the host using cluster APIs.
2. Decommission the failed host.
3. Commission the new host with the correct network.
4. Add the newly commissioned host to the cluster using cluster APIs. D. 1. Remove the host using cluster APIs.
2. Decommission the failed host.
3. Add the newly commissioned host to the cluster using cluster APIs.
4. Commission the new host with the correct network.
2. Remove the host using cluster APIs.
3. Add the newly commissioned host to the cluster using cluster APIs.
4. Commission the new host with the correct network. B. 1. Decommission the failed host.
2. Remove the host using cluster APIs.
3. Commission the new host with the correct network.
4. Add the newly commissioned host to the cluster using cluster APIs. C. 1. Remove the host using cluster APIs.
2. Decommission the failed host.
3. Commission the new host with the correct network.
4. Add the newly commissioned host to the cluster using cluster APIs. D. 1. Remove the host using cluster APIs.
2. Decommission the failed host.
3. Add the newly commissioned host to the cluster using cluster APIs.
4. Commission the new host with the correct network.
Answer: C
Question #10 (Topic: Exam A)
Which two steps must be performed to create a vSphere with Tanzu namespace? (Choose two.)
A. Deploy a vSphere Cluster
B. Enable Harbor Image Registry
C. Use a DNS-compliant name
D. Assign permissions
E. Define resource limits
Answer: CD