VMware 2V0-21.23 - VMware vSphere 8.x Professional Exam

Question #6 (Topic: Exam A)
A vSphere cluster has the following configuration:
Virtual machines (VMs) are running Production and Test workloads
vSphere Distributed Resource Scheduler (DRS) is enabled
There are no resource pools in the cluster
Performance monitoring data shows that the Production workload VMs are not receiving their fully allocated memory when the vSphere cluster is fully utilized.
A combination of which two steps could the administrator perform to ensure that the Production VMs are always guaranteed the full allocation of memory? (Choose two.)
A. Assign a custom memory share value to the resource pool containing the Production VMs. B. Assign a memory reservation value to the resource pool containing the Production VMs. C. Create a parent resource pool for the Production VMs. D. Create a sibling resource pool for each of the Production and Test VMs. E. Create a child resource pool for the Test VMs.
Answer: BC
Question #7 (Topic: Exam A)
Which two datastore types store the components of a virtual machine as a set of objects? (Choose two.)
A. VMware Virtual Machine File System (VMFS) B. VMware vSAN C. Network File System (NFS) 3 D. vSphere Virtual Volumes (vVols) E. Network File System (NFS) 4.1
Answer: BD
Question #8 (Topic: Exam A)
Refer to the exhibit.

After updating a predefined alarm on VMware vCenter, an administrator enables email notifications as shown in the attached alarm; however, notifications are NOT being sent.
Where must the mail server settings be configured by the administrator to resolve this issue?
A. In the ESXi host system config B. In the alarm rule definition C. In the vCenter settings in the vSphere Client D. In the vCenter Management Interface
Answer: C
Question #9 (Topic: Exam A)
An administrator creates a virtual machine that contains the latest company-approved software, tools and security updates. Company policy requires that only full clones are allowed for server workloads.
A combination of which two tasks should the administrator complete to prepare for the deployment of this virtual machine for multiple users? (Choose two.)
A. Set appropriate permissions on the virtual machine. B. Create a virtual machine customization specification. C. Upgrade the virtual hardware. D. Convert the virtual machine to a template. E. Take a snapshot of the virtual machine.
Answer: BD
Question #10 (Topic: Exam A)
During the staging of a patch on a vCenter Server Appliance, an error was encountered and the process stopped. An administrator resolved the root cause and is ready to continue with the staging of the patch.
From the vCenter Management Interface, which action should the administrator take to continue the process from the point at which the error occurred?
A. Use the Stage and Install option to resume the staging. B. Use the Resume option to resume the staging. C. Use the Unstage option to restart the staging. D. Use the Stage Only option to restart the staging.
Answer: B
Download Exam
Page: 2 / 22
Total 110 questions