Nutanix NCS-Core 6.8 - Nutanix Certified Services - Core (NCS-Core) 6.8 Exam

Question #6 (Topic: Exam A)
A customer wants to validate the Microsoft SQL workload performance for a CRM application before migration to the new Nutanix cluster.
Which activity must the consultant add as part of the test plan to fulfill this requirement?
A. Run perform on all CVMs. B. X-Ray with OLTP Workload. C. X-Ray with OLAP Workload. D. Run perform on guest VM.
Answer: B
Question #7 (Topic: Exam A)
After an onsite cluster deployment, a consultant prepares the deliverables for a project closeout.
Which two data in the As-Built Guide require adjustment or might be missing completely? (Choose two.)
A. Cluster Information B. AHV Host Information C. Nutanix Node Port Layout D. Physical Rack Layout
Answer: BC
Question #8 (Topic: Exam A)
In preparing to install a new cluster for a company, a consultant needs to complete an installation worksheet.
Which values must be documented prior to initial base system setup?
A. Hypervisor. CVM, and IPMI IP Addresses B. Prism Central IP Address C. DNS and NTP IP Addresses D. Block Serial Numbers
Answer: C
Question #9 (Topic: Exam A)
At which prompt should a consultant execute the command manage_ovs - bridge_name br0 show_uplinks in a Nutanix cluster?
A. [root@AHV~]# B. root@CVM~# C. esxi@CVM~$ D. nutanix@CVM~$
Answer: D
Question #10 (Topic: Exam A)
The installation process stops before imaging any of the nodes and an error message is displayed notifying the IPMI IP address is unreachable.
What should consultant do to fix the issue?
A. Check the service. log and the individual node log files for more detailed information. B. If the nodes are in the same subnet go to the Cluster page and configure multi-homing. C. Ensure the Foundation VM is not in the same broadcast domain as the Controller VMs. D. Re-try Foundation using a non-flat switch.
Answer: C