Question #6 (Topic: Single Topic)
A customer recently set up Async Replication between Site A and Site B. The customer wants to conduct a planned failover and clicks Activate on Site B. The
customer then runs the following command on Site A: ncli pd deactivate_and__destroy_vms name=<protection_domain_name>.
What does this do to the customer environment?
A. VMs get deleted from Site B and the protection domain is now Active. B. VMs are powered off on Site A and must be manually powered on at Site B. C. VMs get deleted from Site A and the protection domain is no longer active. D. Customer must then manually power off VMs at Site A and power them on at Site B.
Answer: C
Question #7 (Topic: Single Topic)
An administrator needs to create and start five new VMs for a Data Analytics Project (OLAP). The VM Profile is as follows:
✑ vCPU:4
✑ vRAM: 64 GB
✑ vDisk: 1.5 TB
Each of the four nodes of the Nutanix cluster has the following:
✑ 24 vCPU. 20% overall usage
✑ 192 GB RAM, 60% overall usage
✑ 2 x l920 GB SSD
✑ 4 x 2 TB HDD
At cluster level, there is a single RF2 container that is 30% utilized and has an extent store capacity of 13.5 TB.
Which component requires administrator attention?
A. Physical RAM, because it is not enough to power on all of the new VMs. B. Physical Cores, because they are not enough to power on all of the new VMs. C. Storage, because the capacity is not enough to create VMs. D. Flash Tier because it is not enough to accommodate the workloads.
Answer: A
Question #8 (Topic: Single Topic)
An administrator manages the following two Nutanix AOS 5.15 cluster environment:
✑ Corp-cluster-01
✑ Corp-cluster-02
The VM images must be available only on Corp-cluster-01, but cannot be checked out to cluster Corp-cluster-02. The images also cannot be checked out to any
other clusters that are registered with Prism Central in the future.
Which two configuration settings must the administrator choose when creating the image placement policy that satisfies the stated requirements? (Choose two.)
A. Create an image placement policy that identifies cluster Corp-cluster-01 as the target cluster B. Set the policy enforcement to Soft. C. Set the policy enforcement to Hard. D. Create an image placement policy that identifies cluster Corp-cluster-02 as the target cluster.
Answer: AC
Question #9 (Topic: Single Topic)
An administrator is supporting a business critical environment and deploys metro availability to achieve a zero data loss configuration. The two clusters are
connected by a 1GbE connection. A new workload is going to be deployed to this cluster. This workload requires a sustained 150MB/s of write throughput and
20MB/s of read throughput.
Which change must be made to deploy the workload successfully on this cluster?
A. The bandwidth must be increased to support this workload. B. The workload must be configured to read at greater than 12.5MB/s. C. The replication frequency must be less than 60 minutes. D. Zero data loss nearsync must be used to support this workload.
Answer: A
Question #10 (Topic: Single Topic)
Refer to the exhibit.

User 1 and User 2 belong to the AAPM group.
What are two descriptions of how Files perform quota management? (Choose two.)
A. User 2 can continue to add another 3GB file but will receive a daily notification email. B. User 1 can continue to add another 5GB file but will receive a daily notification email. C. User 1 can add an 8GB file to the share without receiving notification. D. User 2 can add an 8GB file without receiving a notification email.
Answer: BD