Microsoft MB-320 - Microsoft Dynamics 365 Supply Chain Management, Manufacturing Exam

Question #6 (Topic: Question Set 1)
HOTSPOT
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
[Microsoft-MB-320-1.0/xmlfile-9_1.png]
Answer: [Microsoft-MB-320-1.0/xmlfile-10_1.png]
Question #7 (Topic: Question Set 1)
A manufacturer produces HDMI cables. Typically, the item is manufactured.
The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number
whether they make or buy the item.
What should you do?
A. Select route type as vendor on the route operation when the item is to be purchased. B. In default order settings, select Production for the default order type C. Create a new vendor resource when the item is to be purchased D. In default order settings, select Purchase for the default order type
Answer: A
Question #8 (Topic: Question Set 1)
DRAG DROP
A company manufactures high-end speakers. Customers may choose different color finishes and front grills. You build a product configuration model to represent
this speaker.
You add the following attributes for the finish and grill.
[Microsoft-MB-320-1.0/xmlfile-11_1.png]
You need to create a constraint that defines the allowable finish and grill combinations.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.
Select and Place:
[Microsoft-MB-320-1.0/xmlfile-12_1.png]
Answer: [Microsoft-MB-320-1.0/xmlfile-13_1.png]
Question #9 (Topic: Question Set 1)
DRAG DROP
A configure-to-order company is implementing Dynamics 365 Supply Chain Management. The company is preparing to use the product configuration model
functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Select and Place:
[Microsoft-MB-320-1.0/xmlfile-14_1.png]
Answer: [Microsoft-MB-320-1.0/xmlfile-14_2.png]
Question #10 (Topic: Question Set 1)
HOTSPOT
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and
speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You
add the following attributes:
[Microsoft-MB-320-1.0/xmlfile-15_1.png]
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Hot Area:
[Microsoft-MB-320-1.0/xmlfile-15_2.png]
Answer: [Microsoft-MB-320-1.0/xmlfile-15_3.png]
Download Exam
Page: 2 / 29
Total 141 questions