IBM C2010-501 - IBM Maximo Asset Management V7.5 Infrastructure Implementation Exam

Question #6 (Topic: )
Which two log files can help determine whether the IBM Maximo Asset Management
database is configured successfully?(Choose two.)
A. maxinst.log B. dbconfig.log C. updatedb.log D. dropbackup.log E. restorefrombackup.log
Answer: A,C
Question #7 (Topic: )
Every time a user opens the Work OrderTracking application, the Maximo Java Virtual
Machine crashes. Why?
A. The user's defined default site does not exist. B. The user's default query is running a full table scan. C. The user's work order list contains past due work orders. D. The user's system locale does not match the Maximo defined locale.
Answer: B
Question #8 (Topic: )
Which two tasks should be done to optimize application server performance? (Choose
two.)
A. Turn off antivirus software on the Maximo administrative workstation, B. Modify initial and maximum memory settings if heap size errors are found, C. Regularly tune garbage collection settings once the system is in production, D. Restart the server daily to clear cachefiles that may be filling up the hard drive. E. Run J2EE performance logging at the highest level to make sure all errors or potential errors are captured.
Answer: B,C
Question #9 (Topic: )
User Access Control can be disabled to permit the IBM Maximo Asset Management V7.5
installation to take which action?
A. to create log files B. to run as administrator C. to update the database D. to update the maximo.properties file
Answer: D
Question #10 (Topic: )
What will happen during the IBM Maximo Asset Management V7.5 (Maximo) installation
when this configuration option is selected: Copy files now, but perform the installation
configuration step later?
A. Files from the installation source arecopied to the administrative workstation during the install and si_inst_must be run manually to complete the installation. B. Files from the installation source are copied to the administrative workstation during the install and updatedb must be run manually to complete the installation. C. Files from the installation source are copied to the administrative workstation during the install and taskRunner must be run manually to complete the installation. D. Files from the installation source are copied to the administrative workstation, taskRunner is run during the install, and the Maximo EAR file must be deployed manually to complete the installation.
Answer: C