Question #6 (Topic: Topic 1)
What is the advantage of NVMe U.2 flash drives on a Power System E980 SAP HANA BW implementation?
A. They can provide internal boot capability for dual VIOS. B. They allow for Live Partition Mobility of HANA databases through CAPI 2.0. C. They can provide AIX Preferred Read storage to reduce SAN latency. D. They can act as an extension to memory for HANA databases.
Answer: C
Question #7 (Topic: Topic 1)
A customer with a Power System E880C is considering a model conversion to a Power System E980. They currently have Elastic CoD enabled.
Which of the following steps will need to be completed to continue to use Elastic CoD on the Power System E980?
A. Prepay for Elastic CoD usage when placing the upgrade MES order for the Power System E980. B. Reorder the Elastic CoD enablement features when placing the upgrade MES order for the Power System E980. C. Reorder the Utility CoD enablement features when placing the upgrade MES order for the Power System E980. D. Convert static activations to mobile activations when placing the upgrade MES order for the Power System E980.
Answer: A
Question #8 (Topic: Topic 1)
A customer requires that each client partition have access to two different VLANs. VLAN tagging will NOT be used in the environment.
? There will be four client partitions, each of which will be connected to VLAN1 and VLAN2.
? There will be two VIOS.
? Redundant Ethernet connections will be accomplished using the Shared Ethernet Adapter (SEA) and dual VIOS.
What is the minimum number of Ethernet ports that will be required in each VIOS?
A. 8 B. 4 C. 6 D. 2
Answer: B
Question #9 (Topic: Topic 1)
A customer has four AIX VMs, each running a different application that needs simultaneous read/write access to the same files.
Which of the following products should be recommended?
A. Power HA Enterprise Edition B. Spectrum Scale C. Spectrum Protect D. Power HA Standard Edition
Answer: A
Question #10 (Topic: Topic 1)
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of
the servers.
Which resource provides the SMT2 performance of the two systems?
A. IBM Performance Management for Power Systems B. IBM Power Systems Performance Report C. IBM Power Systems Facts and Features D. IBM Systems Workload Estimator
Answer: A