The customer needs to delete the D1 from the customer structure. Select the four steps that should be performed in order to delete the D1 Cost from the cost structure.

  • A. Run the Frozen Standard Update.
  • B. Delete the net added cost from the Enter/Change Cost Component
  • C. Update the “sales/Inventory” Cost of the parent item.
  • D. Remove the cost type from the routing step.
  • E. Run the Simulate Standard Rollup


Answer : B,C,D,E

In order to retrieve a bill of material and routing, the Cost Simu-lation program (R30812) uses the following:

  • A. Batch Quantity
  • B. Issue Type Code
  • C. Accounting Cost Quantity
  • D. Operation Number
  • E. Bill and Routing Type "M"
  • F. Valid Effective Dates


Answer : A,D,F

Which three statements about Work Order Completions are true?

  • A. A Work Order can be completed at multiple locations.
  • B. A Work Order can be completed with or without backflushing the parts.
  • C. Partial Work Order Completions are not possible with backflush.
  • D. A partial completion cannot be reversed.
  • E. Work Orders can be completed with serialized components.


Answer : B,D,E

The customer wants to change multiple Bills of Material by running the "Where Used
Update" program. Which three statements are true about the "Where Used Update" program?

  • A. The ability to replace one component item with another
  • B. The ability to change all of the Work Order parts lists with the Parent item
  • C. The ability to change the unit of measure
  • D. The ability to change the batch quantity of the parent item
  • E. The ability to change the effective dates for an item


Answer : A,C,E

Identify two Manufacturing Dashboard reports:

  • A. Material Lead Time
  • B. On Time Production Completions
  • C. Actual production vs. Planned Variance
  • D. Supplier on Time Delivery
  • E. Work in Process


Answer : A,D

The customer wants to soft commit material to a Work Order when its parts list is attached and hard commit it when the stop paperwork is printed. Where is this set up?

  • A. Branch/Plant Constants
  • B. Manufacturing Constants
  • C. Item Branch/Plant
  • D. Commitment Method


Answer : D

The customer needs to create Work Orders to support the manufacturing process. Which three statements regarding Work Orders are true?

  • A. MRP Messages for manufactured items are actually work order headers at status "Blank."
  • B. The user can specify the revision level.
  • C. Values in the Work Order Type and Work Order Priority are defaulted from the data dictionary.
  • D. Enabling the Work Order Freeze Code prevents MRP from suggesting expediting or deferring a Work Order.
  • E. The Work Order number is also the Subledger number in a General Ledger entry.


Answer : A,B,D

The customer needs to create Work Orders to support the manufacturing process. Which three statements about Work Orders are true?

  • A. Category Code values from the parent's Item Branch Plant Record can be loaded into a Work Order header.
  • B. Item-based shrink will increase the quantities of components on the parent Work Order's parts list.
  • C. The Lot Number can be assigned any time up to and Including- Work Order completion.
  • D. Manually copying a Routing to make a Routing specific to a Work Order will advance the status of the Work Order
  • E. Manually copying a Bill of Material to make a parts list will advance the status of the work order.


Answer : A,B,E

The customer captures all variance types for all work orders. What type of variance is created when a change is intentionally made to a parts list before the work order is released to the shop floor?

  • A. Planned variance
  • B. Other Variance
  • C. Labor Variance
  • D. Engineered Variance


Answer : C

When you are issuing inventory, the system ____________, _____________, and
___________?

  • A. Commits inventory
  • B. Relieves inventory
  • C. Updates the Item Location file
  • D. Writes records to the Item Ledger file
  • E. Updates the Bill of Materials


Answer : B,C,E

When changing the Bill of Material through an Engineering Change Order, which three statements are TRUE?

  • A. Updates the bills of material for the items on the ECO
  • B. Updates the Work Order parts list related to the parent item
  • C. Validates the ECO for full approval before accepting the requested changes
  • D. Deletes Invalid records from Bill of Material
  • E. Updates the parent or component revision level


Answer : A,C,E

Choose two objectives of Quality Management

  • A. Provides the ability to create and maintain customers tests
  • B. Develops a testing method for On Time Delivery
  • C. Provides lot tracing capability
  • D. Offers the ability to capture financial data


Answer : B,D

Which three statements about Configurator are true?

  • A. Configurator is a very cost effective tool for complex, one-of-a-kind end items.
  • B. The features and options that constitute a configured item are part of a Segment.
  • C. Configurator can reduce order lead time.
  • D. The Cross-Segment Editing Rule establishes the relationships between the segments of a configured item.
  • E. Purchase Orders cannot be created for configured items.


Answer : B,C,E

When attempting te complete a work order using Super Backflush (P31123), the system generates the following error message: "Work Center Rates Not Set Up (error ID 4474)".
However, when checking the work centers, the rates are set up correctly. The Super
Backflush process cannot be completed. What Information should be checked?

  • A. The Sales/Inventory cost method of the parent item
  • B. The cost method processing option in the Super Backflush (P31123) program
  • C. The work center cost method and the parent item cost method are the same
  • D. Work Order Master Tag File Cost Method field
  • E. Work Order Header Cost Method


Answer : E

Product Costing is used to calculate costs for the subassembly or finished product using the information stored which files?

  • A. Bill of Material (F3002) and the Routing (F3003) files
  • B. Company Constants and Address Book Files
  • C. Inventory Master and Bill of Material
  • D. Routing and Inventory
  • E. Routing and Work Order


Answer : A