In Microsoft Dynamics AX 2012, you create a bill of materials (BOM) that will be used in the production flow. In the BOM line for a specific item you leave the Warehouse field blank.
Where are the warehouse and location defined that will be used when the item is picked in a production flow?

  • A. in the default production flow
  • B. on the Kanban FastTab of the Kanban rules
  • C. in the active production flow version
  • D. in the work cell


Answer : D

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White
Paper, April 2011, p9-10.

You need to determine whether the production flow is running too quickly.
Which takt time should you compare with the actual takt time?

  • A. average
  • B. minimum
  • C. maximum
  • D. required


Answer : B

Reference:
http://msdn.microsoft.com/en-us/subscriptions/hh209606.aspx

Which order type is used by Master Planning to create planned orders for items supplied by
Kanbans?

  • A. Kanban
  • B. purchase order
  • C. transfer
  • D. production


Answer : A

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing,
White Paper, July 2011, p9.

You are configuring a Lean production flow in Microsoft Dynamics AX 2012.
Which cost group type should you assign to a subcontracting work cell?

  • A. indirect
  • B. direct outsourcing
  • C. external operation
  • D. direct materials


Answer : B

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White
Paper, April 2011, pp 41, 44.

In Microsoft Dynamics AX 2012, you create a work cell that has a capacity model setting of
Throughput. Which of the following values are used to calculate the capacity load of a
Kanban job on the work cell? (Each correct answer presents a partial solution. Choose three.)

  • A. start date
  • B. cycle time
  • C. Kanban quantity
  • D. throughput ratio
  • E. unit correction factor


Answer : B,C,D

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing,
White Paper, July 2011, p 10.

In Microsoft Dynamics AX 2012, the Capable to Promise (CTP) explosion is run for an item on a sales order line. The system determines that a date requested on the sales order line cannot be met. Which field is updated to reflect the date calculated by the CTP functionality?

  • A. Confirmed ship date
  • B. Confirmed delivery date
  • C. Requested ship date
  • D. Scheduled period date


Answer : A

Reference:
http://dynamicscare.com/blog/index.php/capable-to-promise-or-ctp-to-the-friends-of- ax2012/

You are running the item price calculation on a range of products in Microsoft Dynamics AX
2012. Which settings affect whether a bill of materials (BOM) and route or a Lean manufacturing production flow will be used to calculate costs? (Each correct answer presents part of the solution. Choose two.)

  • A. cost group on the product
  • B. planned order type on the item coverage
  • C. default order type on the default order settings
  • D. production flow or route number on the item price calculation


Answer : A,B

Reference:
http://technet.microsoft.com/en-us/library/aa571515.aspx
http://technet.microsoft.com/en-us/library/aa496553.aspx

Which of the following statements about manufacturing Kanbans in Microsoft Dynamics AX
2012 are true? (Each correct answer presents a complete solution. Choose two.)

  • A. Amanufacturing Kanban relates to at least one process activity.
  • B. A manufacturing Kanban must have a transfer activity as its first activity.
  • C. A manufacturing Kanban moves a Kanban of a specific item between supermarkets.
  • D. Amanufacturing Kanban is assigned to a resource group with the role of a work cell.


Answer : A,D

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing,
White Paper, July 2011, p 6.

Which inventory model should you select for the product used as the payment item in activity-based subcontracting?

  • A. Standard cost
  • B. FIFO
  • C. Weighted avg.
  • D. LIFO


Answer : B

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White
Paper, April 2011, p 45.

In Microsoft Dynamics AX 2012, you create a work cell and define its capacity by using a production flow model with a model type of Throughput.
Which statement about the capacity of the work cell is true?

  • A. The capacity of the work cell is measured in quantities of the product being produced.
  • B. The capacity of the work cell may not be changed.
  • C. The capacity of the work cell is defined by the product produced per hour.
  • D. The capacity of the work cell is finite.


Answer : A

Reference:
http://msdn.microsoft.com/en-us/subscriptions/hh209069.aspx

On the pegging tree, which job status is indicated by a check mark on the Kanban ticket icon?

  • A. Planned
  • B. Not planned
  • C. Completed
  • D. In progress


Answer : C

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing,
White Paper, July 2011, p 26.

What is a valid exception to the standard cost requirement in Microsoft Dynamics AX
2012?

  • A. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to Yes
  • B. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to No.
  • C. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to No.
  • D. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to Yes.


Answer : C

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White
Paper, April 2011, p 28-30.

Which status allows the product quantity and Kanban quantity to be edited in a Kanban quantity proposal?

  • A. Created
  • B. Updated
  • C. Completed
  • D. Calculated


Answer : A

Reference:
http://msdn.microsoft.com/en-us/subscriptions/hh597101.aspx

Which of the following are valid BOM line events? (Each correct answer presents a complete solution. Choose two.)

  • A. Manual
  • B. Automatic
  • C. Not active
  • D. Batch


Answer : B,C

Reference:
http://msdn.microsoft.com/en-us/subscriptions/hh227370.aspx

In Microsoft Dynamics AX 2012, when is a transfer activity set up as subcontracted? (Each correct answer presents a complete solution. Choose two.)

  • A. When Freighted by is set to Shipper and the To warehouse is managed by a vendor
  • B. When Freighted by is set to Shipper and the From warehouse is managed by a vendor.
  • C. When Freighted by is set to Recipient and the From warehouse is managed by a vendor.
  • D. When Freighted by is set to Recipient and the To warehouse is managed by a vendor.


Answer : A,D

Reference:
Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White
Paper, April 2011, p 45-46.