A company that makes artisan chocolate is implementing Dynamics 365 Supply Chain Management.
To safeguard the quality of its ingredients, the company limits recipe substitutions of its chocolates.
Its top-selling chocolate bar must contain 20 percent sugar. The sugar can be obtained from either cane or beet sugar depending on supply at the time of production.
The system must be able to automatically substitute the appropriate sugar items when generating production orders to meet the quality level of sugar even when the preferred concentration of cane sugar is out of stock.
You need to configure the system.
Which three components must you configure? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Formula lines
  • B. Priority
  • C. Item allocation key
  • D. Plan group
  • E. Item model group
  • F. BOM lines


Answer : ABD

DRAG DROP -
A manufacturing company is implementing Dynamics 365 Supply Chain Management.
Bill of materials (BOM) calculations are typically based on the item cost price. For a subset of items, the trade agreement price must be used in calculations. If a trade agreement does not exist, the purchase price must be used.
You need to set up the BOM calculations for the items by using the fewest configurations.
Which configurations should you use? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.



Answer :

A customer produces light projection toys for holiday decorations throughout the year. The production process creates the projection toy at the following work cells: stands, main assembly, electric, visuals, and packaging.
Vendors must create templates for each toy they produce each season. They must manage the transfer of templates to the warehouse. Each transfer for each vendor must use the same purchase agreement.
You need to configure the subcontracted transfer activity.
What should you do?

  • A. Set the transfer activity Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the vendor.
  • B. Set the transfer activity Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the warehouse.
  • C. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements include the vendor ID of the warehouse.
  • D. Set the transfer activity Freighted by value to Recipient. Ensure that purchase agreements inside the vendor ID of the vendor.
  • E. Set the transfer activity Freighted by value to Shipper. Ensure that purchase agreements include the vendor ID of the warehouse.
  • F. Set the transfer activity Freighted by value to Carrier. Ensure that purchase agreements include the vendor ID of the warehouse.


Answer : C

HOTSPOT -
A candy manufacturer uses Dynamics 365 Supply Chain Management.
A master planning run needs to prioritize the production jobs for fruit snacks by flavor and color every 16 days.
You need to configure the appropriate parameters in the coverage group.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.



Answer :

You are the production scheduler at a manufacturing company. The company is not using advanced warehousing.
You have firmed a planned production order from master planning. The order is ready to be processed.
You now need to process the order in production control.
What should you do first?

  • A. Start the order.
  • B. Estimate the order.
  • C. Schedule the order.
  • D. Report the order as finished.


Answer : B

A manufacturer is implementing master planning in Dynamics 365 Supply Chain Management for planned orders.
Master planning is running for the first time in the production environment.
You need to instruct the production planners where to view the following information:
Planned orders that are created in a run.
An item’s planned orders against the demand over user-defined periods of time.
In which two possible locations can the information be found? Each correct answer presents a complete solution,
NOTE: Each correct selection is worth one point.

  • A. Sequenced planned orders
  • B. Net requirements form
  • C. Supply Schedule form
  • D. Item requirement statistics
  • E. Planned orders


Answer : BE

A product is produced through lean manufacturing. The cleaning and inspection is performed by a contractor as an activity of a production flow.
You need to assign the appropriate cost group type for the subcontracted work.
Which cost group type should you use?

  • A. Undefined
  • B. Direct outsourcing
  • C. Direct manufacturing
  • D. Direct material
  • E. Indirect


Answer : B

DRAG DROP -
A company has manufacturing sites that process different types of production orders using highly specialized equipment.
Released production orders have been processing for an excessive amount of time while the system tries to find a variable route that conforms to the constraints specified in the system.
The system must automatically time out if a viable solution is not found after 120 seconds.
You need to configure the automatic timeout.
Which form should you use for each configuration? To answer, drag the appropriate forms to the correct configurations. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.



Answer :

DRAG DROP -
A manufacturing company uses Dynamics 365 Supply Chain Management.
The shop floor has multiple pieces of the same model of equipment. The equipment produces a finished good that requires special handling.
The equipment has a visual guide available. The shop floor manager requires the following:
The most recent visual guide must be available for all pieces of the equipment at the same time.
The shop floor workers must have a visual guide available for handling of the finished good.
You need to configure the visual guides to meet the shop floor requirements.
What should you configure for each requirement? To answer, drag the appropriate features to the correct requirements. Each feature may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.



Answer :

A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company rents a distribution warehouse space located within a major US port. The company requires an operational cloud scale unit for the distribution warehouse
You need to set up the operational cloud scale unit.
Which three types of transactions will you be able to create within the warehouse? Each correct answer presents a complete solution,
NOTE: Each correct selection is worth one point.

  • A. Transfer order for goods to other company locations
  • B. Receipt of goods
  • C. New load during wave execution
  • D. Purchase return order
  • E. Advance ship notice


Answer : BCE

HOTSPOT -
A company uses Dynamics 365 Supply Chain Management.
The company plans to use the Asset management module to maintain its installed base of milling machine fixtures.
The module must be configured to handle the following requirements:
An oil sampling must be taken from each machine at regular intervals.
All calibration types (tooling, instrumentation, and tolerances) that share a required performance skillset must be managed together.
The company is unable to perform in-house preventive maintenance skills on the pneumatic tapping machines. Therefore, the company hires outside services for it.
All maintenance must be scheduled at the same time for efficiency and cost savings.
You need to configure the system.
Which option should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.



Answer :

A company produces homeopathic lotions for pain relief. The lotions use a combination of ProductA and ProductB. ProductA is the primary ingredient. You use ProductB to adjust the concentration of active ingredients in the lotion. ProductC represents the remainder.
You need to ensure that the lotion final product has a consistent concentration of anti-inflammatory agents.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Set the formula line type of ProductA to Compensating.
  • B. Set the formula line type of ProductB to Compensating.
  • C. Set the formula line type of ProductB to Active.
  • D. Set the formula line type of ProductC to None.
  • E. Set the formula line type of ProductA to Active.


Answer : BE

A company uses Dynamics 365 Supply Chain Management.
Due to supply chain issues, the bill of materials (BOM) for finished goods requires substitute products and subcomponent redesign. The engineering team must update the product designs and release to the companies. The products already exist and are not currently configured for version control on transactions.
You need to configure the solution.
Which three actions should you perform? Each correct answer presents a partial solution.
NOTE: Each correct selection is worth one point.

  • A. Enable version tracking on transactions.
  • B. Run the Convert to engineering product wizard.
  • C. Use the automation solution template.
  • D. Enable engineering change management.
  • E. Enable change management on existing products.


Answer : BDE

A client uses Kanban rules to plan, track, and process requirements that are based on production flows.
You need to replenish requirements that are calculated by master planning.
Which replenishment strategy should you use?

  • A. Event
  • B. Automatic planning quantity
  • C. Fixed quantity
  • D. Scheduled


Answer : D

DRAG DROP -
A manufacturing company is implementing Dynamics 365 Supply Chain Management.
You have a bill of materials (BOM) for each finished good. Finished goods may have subcontracted operation steps.
You need to configure the BOM lines.
What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.



Answer :