Oracle Order Management Cloud 2017 Implementation Essentials v1.0 (1z0-347)

Page:    1 / 6   
Total 84 questions

Which two statements describe Net Change Collection? (Choose two.)

  • A. Data for the selected entities is replaced in the planning data repository.
  • B. It completely refreshes the planning data repository.
  • C. Data for the selected entities is deleted from the planning data repository.
  • D. It collects only changed data to the planning data repository.
  • E. It collects data only incrementally to the planning data repository.


Answer : BE

Reference:
https://docs.oracle.com/cloud/farel12/scmcs_gs/FAIVC/FAIVC1829182.htm#FAIVC1841749

Your customer uses an external order capture system and wants to perform certain actions without routing them through Order Management. Which three services are available for the external system to call from Global Order Promising using public web services? (Choose three.)

  • A. Return Order Lines
  • B. Ship Order Lines
  • C. Cancel Scheduling
  • D. Schedule Order Lines
  • E. Check Availability


Answer : CDE

Reference:
http://www.oracle.com/webfolder/technetwork/tutorials/tutorial/cloud/r12/wn/r12-scm-order-wn.htm#_Toc471998467

Your customer is concerned about not having access to schedule orders and check availability when the Global Order Promising server is down. Which two statements are true? (Choose two.)

  • A. Affected orders can be rescheduled based on supply chain availability search after server recovery.
  • B. Global Order Promising continues promising orders based on supply chain availability search until the server or backup server can be restarted.
  • C. Global Order Promising cannot continue promising orders, but the server or backup server is usually restarted quickly.
  • D. Affected orders cannot be rescheduled based on supply chain availability search after server recovery.
  • E. Global Order Promising continues promising orders based on lead-time availability until the server or backup server can be restarted.


Answer : AB

Reference:
http://www.oracle.com/webfolder/technetwork/tutorials/tutorial/cloud/r12/nfs/r12-scm-order-features.htm#_Toc463340131

Your customer would like automatic e-mail notifications to be sent for specific business events. On the Manage Business Event Trigger Points page, which business event trigger points can be used to enable e-mail notifications?

  • A. Order header status update and order attribute update
  • B. Order header status update and hold
  • C. Order attribute update and hold
  • D. Change order compensation complete and hold
  • E. Hold and split


Answer : D

You are using collaboration messaging to send an advanced shipment notice to a trading partner. You see an error with the status "B2B Error." What does this status indicate?

  • A. It indicates that collaboration messaging is not supported in Order Management.
  • B. It indicates that the message has not been delivered because of a validation error in Collaboration Messaging Framework.
  • C. It indicates that the SOA suite could not deliver the message because of a configuration or processing error.
  • D. It indicates that the message has not been processed because an administrator has put it on hold.
  • E. It indicates that the message has not been delivered because of a configuration or processing error in Collaboration Messaging Framework.


Answer : E

What are the three future types of supply planned orders that GOP can consider? (Choose three.)

  • A. Transfer Planned Orders
  • B. Buy Planned Orders
  • C. Scrap Planned Orders
  • D. Rework Planned Orders
  • E. Make Planned Order


Answer : ABE

Explanation:
Future supply can include the supply that results from planned orders of three types: make, buy, or transfer.
Reference:
https://docs.oracle.com/en/cloud/saas/supply-chain-management/r13-update18a/fascp/promise-orders-and-manage-order-promising- demands.html#FASCP2340549

You are creating a sales order and would like to see the sales order as a document. From the actions drop down menu what should you select?

  • A. Create Document.
  • B. Order documents are not supported.
  • C. Create PDF (Portable Document Format).
  • D. Edit Additional Information.
  • E. Manage Attachments.


Answer : A

Reference:
https://docs.oracle.com/cloud/farel12/scmcs_gs/FAIOM/FAIOM2247061.htm#FAIOM2222769

Your customer has requested that sales order details are sent to his e-mail address. How will Order Management Cloud format the order details in the e-mail?

  • A. Order Management will include the order details in an attached Word document.
  • B. Order Management will include the order details in an attached PDF (Portable Document Format).
  • C. You cannot send order details through an e-mail.
  • D. Order Management will include a link to a webpage with order details in the body of the e-mail.
  • E. Order Management will include the order details in the body of the e-mail.


Answer : B

Reference:
https://docs.oracle.com/cloud/farel12/scmcs_gs/FAIOM/FAIOM2247061.htm#FAIOM2222769

Which three statements are true about the Visual Information Builder interface? (Choose three.)

  • A. Post-transformation rules and external integration routing rules can be created by using the Visual Information Builder interface.
  • B. The Visual Information Builder interface is a simplified drag-and-drop rule editor.
  • C. In the Visual Information Builder interface, you create external interface routing rules by using the Manage External Integration Routing Rules page.
  • D. Pre-transformation rules and external integration routing rules can be created by using the Visual Information Builder interface.
  • E. In the Visual Information Builder interface, you create external interface routing rules by using the "Manage External Integration Routing Rules for Sales Orders" page.
  • F. The Visual Information Builder interface is the same as the editor for Oracle Business Rules.


Answer : BCD

Reference:
https://docs.oracle.com/cloud/farel12/scmcs_gs/FAIOM/FAIOM2217778.htm#FAIOM2217778

How can split fulfillment lines in Order Management be managed independently?

  • A. Split fulfillment lines can be managed independently because they are often being shipped from different warehouses.
  • B. Split fulfillment lines can be managed with an orchestration process instance that has been created for them.
  • C. Split fulfillment lines cannot be managed independently.
  • D. Split fulfillment lines can be managed independently because they have different attributes.


Answer : B

Your customer wants to use Oracle Integration Cloud Service with Order Management to communicate business events. Select the option that shows the correct order in which the steps should be executed.

  • A. Manage business event trigger points, create an integration, create a connection, and track business events.
  • B. Track business events, manage business event trigger points, and create an integration.
  • C. Manage business event trigger points, create a connection, create an integration, and track business events.
  • D. You cannot use Oracle Integration Cloud service with Order Management to communicate business events.
  • E. Create an integration, create a connection, and track business events.


Answer : C

Reference:
https://docs.oracle.com/cloud/farel12/scmcs_gs/FAIOM/FAIOM2061947.htm

A company manufactures and ships industrial water filters from its only factory unit in India. Which four types of lead time can the company use to create promising rules in lead-time promising mode? (Choose four.)

  • A. total lead time
  • B. processing lead time
  • C. supplier lead time
  • D. transit lead time
  • E. cumulative total lead time
  • F. cumulative manufacturing lead time
  • G. user-defined lead time


Answer : AEFG

Reference:
https://docs.oracle.com/en/cloud/saas/supply-chain-management/18b/fascp/manage-order-promising-rules.html#FASCP190544

Which three statements are false in regard to integrating public Global Order Promising web services with external order capture and management systems?
(Choose three.)

  • A. You can collect Sales Orders that are scheduled in external order management systems into Global Order Promising.
  • B. No steps are required to enable calling Global Order Promising by using public web services.
  • C. The services cannot be used to inquire about the availability of supply for a potential order before the order is created in Oracle Order Management.
  • D. Several steps are required to enable calling Global Order Promising by using public web services.
  • E. You cannot collect Sales Orders that are scheduled in external order management systems into Global Order Promising.


Answer : ACD

Which four options apply to the "Lead Time" mode? (Choose four.)

  • A. Lead time can be specified in multiple ways.
  • B. The item is promised on the requested date irrespective of availability.
  • C. Calendars and transit time constraints are respected.
  • D. No supply availability search is performed.
  • E. The order promising engine does not generate any pegging.


Answer : ACDE

Reference:
https://docs.oracle.com/cd/E51367_01/scmop_gs/FASCP/F1127121AN1246A.htm

In the Cloud Order Management system, identify the function performed by the External Interface Layer.

  • A. It manages the communication between Order Management and external or internal fulfillment systems.
  • B. It sends information to downstream fulfillment systems, and interprets responses and updates from those systems.
  • C. It receives information from upstream order capture systems, sends information to downstream fulfillment systems, and interprets responses and updates from those systems.
  • D. It imports orders and processes them to fulfillment lines before assigning them to fulfillment systems.


Answer : B

Reference:
https://docs.oracle.com/cloud/r13_update17b/scmcs_gs/FAIOM/FAIOM2061945.htm