Oracle Utilities Meter Solution Cloud Service 2022 Implementation Professional v1.0 (1z0-1091-22)

Page:    1 / 4   
Total 51 questions

A new fast food restaurant is being installed at the center of a university. The restaurant will be metered, but its usage will also be included in the university's master meter.
What should you do to bill the university correctly?

  • A. Configure the restaurant's service point on the university's usage subscription to exclude the restaurant's usage.
  • B. Exclude the restaurant's usage from customer information system (CIS).
  • C. Use derivation algorithms to exclude the restaurant's usage from the master meter.
  • D. Set up a virtual meter to exclude the restaurant's usage from the master meter.


Answer : D

For a Meter Data Management (MDM) implementation, a customer requires specific bill determinants along with bill determinant calculation validations to be executed, before the determinant values are exported to their customer information system (CIS).
Which THREE factors should you consider while configuring usage calculation groups? (Choose three.)

  • A. CIS rates, that MDM bill determinants or the usage process are expected to support
  • B. Bill determinants or usage validations
  • C. Bill determinants or usage calculations
  • D. Type of measurement (interval or scalar) data that needs to be used for bill determinants or usage calculation
  • E. Device subscriptions


Answer : ABD

From where is the final measurement condition code created?

  • A. Post-VEE condition code
  • B. Raw condition cade
  • C. Pre-VEE condition code
  • D. Condition code sent from head-end system (HES)


Answer : D

Devices are often added to Meter Data Management (MDM) via a synchronization process. Device configuration business objects (BOs) can be configured to use Synchronization Add BO to determine the appropriate BO for the new device.
What is Synchronization Add BO associated with?

  • A. Business service associated with DI-Device Configuration BO
  • B. Options on DI-Device Configuration BO
  • C. Validation algorithm on DI-Device Configuration BO
  • D. Lifecycle algorithm on DI-Device Configuration BO


Answer : B

Which THREE statements are true about the Subtractive Interval Data functionality? (Choose three.)

  • A. The IMD load processes calculate consumption in engineering units.
  • B. A new reading condition field ensures that you do not lose the reading quality when a meter's consumption is estimated.
  • C. You can optionally validate for rollover exceptions and negative consumption calculations.
  • D. It validates consumption in initial measurement data (IMD).
  • E. It converts engineering units into reads.


Answer : ACD

Which TWO statements are true about the Measurement Reprocessing functionality? (Choose two.)

  • A. When a meter multiplier changes retroactively, measurements are reprocessed, triggering billing adjustment notifications that are sent to the customer information systems.
  • B. When an installation constant changes retroactively for a meter, measurements are automatically reprocessed, triggering billing adjustment notifications that are sent to the customer information systems.
  • C. Measurement reprocessing is executed by users manually, which imparts corrected initial measurement data (IMD) records.
  • D. Derived measurements are recalculated based on new data.


Answer : AD

Which THREE commands are supported by the Smart Grid Gateway (SGG) adapters? (Choose three.)

  • A. Request outage information
  • B. Or-demand reading
  • C. Ping meter
  • D. Connect
  • E. Disconnect service at pole


Answer : ABE

Dynamic aggregation uses dynamic queries for aggregation processes. These dynamic queries are based on the configuration of administrative data.
Which THREE statements are true about the dynamic aggregation main components? (Choose three.)

  • A. Measuring Component Sets define the dimensions and criteria by which aggregation is performed.
  • B. Aggregation Ordering Sets define the ordering of a series of related aggregations and the schedule of aggregation.
  • C. Measuring Components, also known as aggregator MCs, represent "buckets" or unique combinations of dimension values.
  • D. Aggregation Measuring Component Types define the most important properties of aggregation measuring components used for storing aggregated data.
  • E. Data sources store project-provided SQL for getting data.


Answer : ABC

If a project is setting up meter commands with a head-end system (HES), which TWO components should you configure to support the inbound responses from HES? (Choose two.)

  • A. Inbound web services
  • B. Outbound message type
  • C. Master configurations
  • D. Message sender


Answer : AD

Which step should you perform to configure commands in a SaaS environment?

  • A. Create Object Storage locations (or buckets).
  • B. Configure File Storage Configuration (F1-FileStorage) extendable lookup.
  • C. Configure the following processing methods: Unit of Measure (UOM) Translation, Initial Measurement Creation, and Device Event Mapping.
  • D. Create key rings and key pairs.
  • E. Configure outbound and inbound communications (Request/Response model).


Answer : E

Why would you use an eligibility criteria in usage subscription?

  • A. To configure an optional usage calculation rule within a usage calculation group for the usage.
  • B. To configure an optional validation group within a usage subscription.
  • C. To determine whether a usage subscription generates a usage transaction.
  • D. To configure an optional usage group within a usage subscription.


Answer : C

You need to set up a configuration that allows service points to be used with various meters. This configuration should support interval, time of use, and scalar devices.
How would you meet this requirement?

  • A. Configure three service points and set any one of the three devices to be related to the service point as required by the data scenarios.
  • B. Configure one service paint, one device, and three measuring components to be related to the service point as required by the data scenarios.
  • C. Configure one service point type and three device types, and then configure the three valid device types on the service paint type.
  • D. Configure one service point, three devices, and set any one of the three devices to be related to the service point as required by the data scenarios.


Answer : C

Which TWO functions can the service point-measurement cycle relationship of Meter Data Management (MDM) perform? (Choose two.)

  • A. Initiate request of bill determinants from subscribing systems.
  • B. Initiate push of bill determinants to subscribing systems.
  • C. Create optimal meter reader routes by measurement cycle.
  • D. Create hand-held download read activities.


Answer : CD

A small building with five metered apartments has common areas used by all residents. The common areas are metered separately, and the common usage needs to be spread evenly across residents.
How should you configure the solution to bill each resident accurately?

  • A. Each apartment's usage subscriptions must have two service paints, one for the apartment and one for 20% of the common areas.
  • B. Set up a virtual meter to include the apartment usage and 20% of the common areas.
  • C. Calculate the usage for each apartment by using customer information system (CIS).
  • D. Use a derivation algorithm to include 20% of the common areas with the apartment accounts.


Answer : B

A customer needs to validate high or low tolerances such that exceeding in either direction must not allow the reading to be finalized. In addition, all other validation rules that are configured must be applied to the readings.
Which exception severity should you configure in Validation, Estimation, and Editing (VEE) rules?

  • A. Issues
  • B. Terminate
  • C. Critical
  • D. Informational


Answer : C

Page:    1 / 4   
Total 51 questions